In this paper, we address the assembly line balancing and design problem of assigning tasks and equipment to work stations where there are several equipment alternatives for each task. We consider minimizing the total equipment cost and the number of work stations criteria. We aim to generate efficient solutions with respect to these criteria and propose a branch and bound algorithm whose efficiency is enhanced with powerful reduction and bounding mechanisms. We find that our algorithm is capable of solving problem instances with up to 25 tasks and five pieces of equipment.
13 October 2018 in Engineering, Technology & Applied Science Research
The purpose of this study is to present a new approach for fuzzy control charts. The procedure is based on the fundamentals of Shewhart control charts and the fuzzy theory. The proposed approach is developed in such a way that the approach can be applied in a wide variety of processes. The main characteristics of the proposed approach are: The type of the fuzzy control charts are not restricted for variables or attributes, and the approach can be easily modified for different processes and types of fuzzy numbers with the evaluation or judgment of decision maker(s). With the aim of presenting the approach procedure in details, the approach is designed for fuzzy c quality control chart and an example of the chart is explained. Moreover, the performance of the fuzzy c chart is investigated and compared with the Shewhart c chart. The results of simulations show that the proposed approach has better performance and can detect the process shifts efficiently.
12 February 2024 in Journal of Environmental Economics and Policy
There have been changes since the companies have realized the important role of quality improvement in their success. If they are able to produce high quality products and satisfy demands, then they can survive in competitive global markets. Quality improvement applications aim to decrease variability, which leads to less cost, production time, number of defects, scrap, rework and more customer satisfaction. Quality can be improved by reducing product variability. On the other hand, uncertainty or subjectivity is a part of many engineering and real life problems. However, these problems cannot be solved by traditional methods. This study focuses on constructing Xbar and S control charts in fuzzy environment. The approach is developed by considering the theoretical structure of the Shewhart control charts. The core of the approach depends on the combination of parametric interval estimation and fuzzy statistics. Control limits and samples are presented by fuzzy numbers which ensures to maintain fuzziness in control charts. An important property of the approach is that the fuzzy charts can be reduced to Shewhart control charts. A simulation study was conducted for the performance evaluation of fuzzy Xbar and S control charts. The proposed fuzzy control chart is sensitive to process mean shifts and variance changes, and outperforms the traditional control charts under the changes of variance. In addition, an example from the literature shows that the approach is an effective way of presenting fuzziness in the quality characteristics, which enables the approach to have high applicability to the real life problems.
3 April 2025 in Engineering, Technology & Applied Science Research
This study, proposes a heuristic algorithm to balance Robotic Assembly Lines (RAL). A flexible line is assumed in which robots can be allocated to any station, perform any task, and have fixed setup costs. To consider both robot allocation costs and limiting the number of stations, the current work aims to minimize the system cost, which includes new station and robot allocation costs. It evaluates the performance of the algorithm with a large set of randomly generated samples and conducts statistical analyses to summarize, compare, and draw conclusions. The experimental results demonstrate the efficacy of the proposed algorithm in addressing large-scale problems in a reasonable timeframe.