Omar INABI

Dr. Omar INABI

GSMI, Université Mohammed VI Polytechnique, Marrakesh, Morocco
orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 October 2023 in Minerals
Verified
Journal Article
Open access
PDF file
SAFA CHLAHBISAFA CHLAHBI
SAFA CHLAHBI
Tikou BelemTikou Belem
Tikou Belem
AEAbdellatif Elghali
Abdellatif Elghali
SRsamia rochdane
samia rochdane
EZEssaid Zerouali
Essaid Zerouali
Mostafa BenzaazouaMostafa Benzaazoua
Mostafa Benzaazoua
Sedimentary phosphate extraction in open-pit operations generates large volumes of waste rock (WR), which are mainly overburdens and interburdens. Traditionally, the WR is mixed and stored on the surface in waste rock piles (WRPs). This paper presents a case study of the Benguerir mine site in Morocco. It investigates the potential valorization of each WR lithology based on the geological and geomechanical properties to reduce their environmental footprint and create added value to “waste.” The WR samples (soils and rocks) were collected from drill cores and mining trenches in the Benguerir mine. The geological characterization results using petrographic descriptions indicate the presence of nine phosphate layers and, in addition to the overburdens, eight interburdens. Four types of WR are identified: carbonate, siliceous, marly clay, and phosphate. The geomechanical characterization of soil-like samples showed an average plasticity index (PI) of 50% according to the methylene blue value (MBV) of 7.1, classifying them in the A3–A4 categories as plastic and clayey marl soils. The hard rock samples have excellent mechanical properties in terms of their uniaxial compressive strength (UCS), Los Angeles abrasion value (LA), and micro-Deval value (MD). The average compressive strength is 104 MPa for the flint, 35 MPa for the phosphate flint, 32 MPa for the silexite, 26 MPa for the limestone, 11 MPa for the indurated phosphate, and 8 MPa for the marly limestone. Based on the obtained results, these WRs can be considered as an excellent alternative secondary raw material for use in civil engineering applications, ceramics, and cement industries.

23 August 2024 in Buildings
Verified
Journal Article
Open access
PDF file
Omar INABIOmar INABI
Omar INABI
AKAbdessamad KHALIL
Abdessamad KHALIL
AZAbir Zouine
Abir Zouine
Rachid HakkouRachid Hakkou
Rachid Hakkou
Mostafa BenzaazouaMostafa Benzaazoua
Mostafa Benzaazoua
Yassine TahaYassine Taha
Yassine Taha
Phosphate mining generates substantial quantities of waste rock during the extraction of sedimentary ores, leading to significant environmental concerns as these wastes accumulate around mining sites. The industry is under increasing pressure to adopt more sustainable practices, necessitating considerable financial investments in remediation and technological advancements. Addressing these challenges requires a holistic strategy that balances social responsibility, environmental preservation, and economic viability. This study proposes an innovative, cost-effective, and environmentally friendly method to manufacture compressed stabilized earth bricks by combining the valorization of phosphate waste rock (PWR) and phosphate washing sludge (PWS). These bricks offer numerous advantages, including low embodied energy, robust mechanical performance, and excellent insulation and thermal properties. Initially, a Toxicity Characteristic Leaching Procedure (TCLP) test and radiometric surface contamination measurement, carried out on raw materials (PWR and PWS), showed that the results were below the permissible limits. Then, the chemical, mineralogical, and geotechnical properties of the raw materials were characterized. Subsequently, various mixtures were formulated in the laboratory using PWR and PWS, with and without cement as a stabilizer. Optimal formulations were identified and scaled up for pilot production of solid bricks with dimensions of 250 × 125 × 75 mm3. The resulting bricks exhibited thermal conductivity and water absorption coefficients that satisfied standard requirements. This method not only addresses the environmental issues associated with phosphate mining waste but also provides a sustainable solution for building materials production.

8 March 2024 in Minerals
Verified
Journal Article
Open access
PDF file
MGMustapha EL GHORFI
Mustapha EL GHORFI
Omar INABIOmar INABI
Omar INABI
HAHicham AMAR
Hicham AMAR
Yassine TahaYassine Taha
Yassine Taha
AEAbdellatif Elghali
Abdellatif Elghali
Mostafa BenzaazouaMostafa Benzaazoua
Mostafa Benzaazoua
Establishing a circular economy in mining begins with a dedicated sampling strategy as its fundamental phase. This specific approach is crucial for enhancing resource retrieval and isolating essential minerals from mining residues. By carefully examining and defining the makeup of waste materials, mining activities can discover overlooked possibilities, promoting sustainability. A thoughtfully planned sampling strategy not only reduces environmental harm but also sets the stage for the effective use of resources. In doing so, the mining industry can shift towards a circular model, adhering to the principles of waste reduction, material reuse, and ultimately promoting a more environmentally conscious and economically viable industry. In the phosphate industry and during the pre-concentration process of phosphate ore through screening, significant amounts of mining waste, consisting of various lithologies including indurated and fine phosphate, coarse-grained silicified phosphate, limestone, and marls, are deposited in waste rock stockpiles. Collecting representative samples from these heterogeneous materials presents challenges in accurately characterizing the entire stockpile. To overcome this issue, circular mining wells were implemented as a novel sampling method in waste rock stockpiles, enabling the collection of intact representative samples. This paper shares a successful experience in constructing three concrete-lined wells within a phosphate mine waste rock stockpile measuring 662 m in length, 240 m in width, and ranging in height from 0 to 65 m. The wells were dug at various depths, ranging from 20 m to 55 m, with a circular section and a diameter of 1.5 m. An integrated method utilizing analytical techniques in conjunction with numerical modeling via Robot Structural Analysis software (version of 2020) was utilized to assess the stress on the well supports and confirm their stability. This methodology serves as a valuable tool for evaluating the stability of similar wells, ensuring the safety of operators. The structural model yielded a stress level of 1 MPa, which aligned with the values obtained from the analytical model. Sensitivity analysis was performed on various parameters (friction angle, Poisson Ratio, and gravity), and the safety factor consistently remained above 1.5 for all scenarios investigated up to a depth of 60 m. Consequently, this study demonstrates that concrete-lined wells can be utilized safely for intact sampling in waste rock stockpiles. This sampling operation will allow the pursuit of optimizing resource utilization and enhancing environmental sustainability, by studying phosphate distribution in the Phosphate Mine Waste Rock (PMWR) for better recovery.

30 June 2023 in Water
Verified
Journal Article
Open access
PDF file
Omar INABIOmar INABI
Omar INABI
MAMustapha Attou
Mustapha Attou
Mostafa BenzaazouaMostafa Benzaazoua
Mostafa Benzaazoua
MQMohamed Qachar
Mohamed Qachar
The Moroccan road network is susceptible to multiple landslides annually, particularly in the northern regions due to high rainfall and specific geology. These events result in significant economic and social negative consequences, highlighting the need for sustainable and cost-effective solutions for network maintenance. This study outlines the methodology employed in addressing the issues within the RR410 regional road (Rifain region of Morocco), which entailed a thorough examination of the malfunctions, specific surveys, laboratory testing, and problem modeling. By incorporating long-term test-derived shear strength parameters, the model indicated that the road platform was stable, and back analysis using TALREN 4 software allows for model calibration. At kilometric point 23, using earthwork-based solutions (e.g., purging and replacing the base layer, employing granular water-insensitive substitution material) was found to provide a sustainable alternative to the expensive reinforced concrete-based solutions commonly used. Furthermore, these solutions contributed to the use of environmentally friendly and locally sourced materials. Road alignment rectification to anchor the platform in suitable soil was also an effective solution, as demonstrated at kilometric point 48. Additionally, enhancing the drainage and sanitation infrastructure, such as installing draining trenches, spurs, and reinforcing existing water structures, is a crucial aspect of addressing most landslides in the region.

3 November 2024 in Land
Verified
Journal Article
Open access
PDF file
ILIKRAM LOUKILI
IKRAM LOUKILI
Omar INABIOmar INABI
Omar INABI
MGMustapha EL GHORFI
Mustapha EL GHORFI
SMSaida El Moutaki
Saida El Moutaki
AGAbdessamad Ghafiri
Abdessamad Ghafiri
To effectively manage the sustainable urban development of cities, it is crucial to quickly understand the geological and geotechnical attributes of the underground. Carrying out such studies entails significant investments and focused reconnaissance efforts, which might not align seamlessly with large-scale territorial planning initiatives within a city accommodating more than 3 million inhabitants, like Casablanca in Morocco. Additionally, various specific investigations have been conducted by municipal authorities in recent times. The primary aim of this study is to furnish city managers and planners with a tool for informed decision-making, enabling them to explore the geological and geotechnical properties of soil foundations using Geographic Information Systems (GISs) and geostatistics. This database, initially intended for utilization by developers and construction engineers, stands to economize a substantial amount of time and resources. During the urban planning of cities and prior to determining land usage (five- or seven-floor structures), comprehending the mechanical traits (bearing capacity, water levels, etc.) of the soil is crucial. To this end, geological and geotechnical maps, along with a collection of 100 surveys, were gathered and incorporated into a GIS system. These diverse data sources converged to reveal that the underlying composition of the surveyed area comprises silts, calcarenites, marls, graywackes, and siltstones. These formations are attributed to the Middle Cambrian and the Holocene epochs. The resultant geotechnical findings were integrated into the GIS and subjected to interpolation using ordinary kriging. This procedure yielded two distinct maps: one illustrating bearing capacity and the other depicting the substratum. The bearing capacity of the soil in the study zone is rated as moderate, fluctuating between two and four bars. The depth of the foundation remains relatively shallow, ranging from 0.8 m to 4.5 m. The outcomes are highly promising, affirming that the soil in Casablanca boasts commendable geotechnical attributes capable of enduring substantial loads and stresses. Consequently, redirecting future urban planning in the region toward vertical expansion seems judicious, safeguarding Casablanca’s remaining green spaces and the small agricultural belt. The results of this work help to better plan the urban development of the city of Casablanca in a smarter way, thus preserving space, agriculture, and the environment while promoting sustainability. In addition, the databases and maps created through this paper aim for a balanced financial management of city expenditures in urban planning.

24 July 2026 in Mining
Verified
Journal Article
Open access
PDF file
MAMustapha Amrani
Mustapha Amrani
Yassine TahaYassine Taha
Yassine Taha
Omar INABIOmar INABI
Omar INABI
Mostafa BenzaazouaMostafa Benzaazoua
Mostafa Benzaazoua
Rachid HakkouRachid Hakkou
Rachid Hakkou
Conventional pavement design methods are generally intended for highways and are not suited to the extreme loading conditions experienced by mining haul roads. This study presents an innovative pavement design for a heavily trafficked phosphate mine haul road (≈22.35 kT·day−1) constructed entirely from phosphate mine waste rock (PMWR), offering a sustainable alternative to conventional aggregates. The proposed structure comprises a 0.35 m sub-base (0–100 mm), a 0.25 m base (0–63 mm), and a 0.07 m semi-granular asphalt concrete (BBSG 0–20 mm) wearing course designed to combine high mechanical performance with effective dust control. The design was validated through an integrated experimental program that included repeated load triaxial testing (RLTT), asphalt stiffness, fatigue and rutting tests, thermogravimetric analysis (TGA), and full-scale field trials involving EV2 plate-load testing, dust monitoring, and emergency braking tests using a Komatsu 730E haul truck. The results demonstrate that the proposed pavement provides excellent structural performance. The asphalt mixture achieved a stiffness modulus of 9160 MPa, a fatigue resistance of 139.6 µε, and a proportional rut depth (PRD) of only 2.2%. In the field, the compacted sub-base and base reached average EV2 values of 153 MPa and 181 MPa, respectively, confirming their high load-bearing capacity. The paved haul road reduced airborne dust emissions by approximately 91%, surpassing the mine’s target of 80%, while also enabling haul-truck operating speeds to double, with associated reductions in tire wear and maintenance. Despite these performance gains, the proposed solution remains economically attractive, with a construction cost of approximately 23.97 €/m2. Overall, the study demonstrates that phosphate mine waste rock can be successfully transformed into a durable, cost-effective, and environmentally sustainable pavement solution for heavy-haul mining roads, providing a practical example of circular economy principles in mining infrastructure.