Timothy Randle

Dr. Timothy Randle

American Society of Civil Engineers
orcid

Research Focus & Metrics

Academic Career Length

28Years (1999-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 July 2017 in Water Resources Research
Verified
Journal Article
Open access
PDF file
MFM. M. Foley
M. M. Foley
JBJ. R. Bellmore
J. R. Bellmore
JOJ. E. O'Connor
J. E. O'Connor
JDJeffrey Duda
Jeffrey Duda
AEA. E. East
A. E. East
AWA. C. Wilcox
A. C. Wilcox
Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam‐removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam‐removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal tends to quickly reestablish connectivity, restoring the movement of material and organisms between upstream and downstream river reaches; (4) geographic context, river history, and land use significantly influence river restoration trajectories and recovery potential because they control broader physical and ecological processes and conditions; and (5) quantitative modeling capability is improving, particularly for physical and broad‐scale ecological effects, and gives managers information needed to understand and predict long‐term effects of dam removal on riverine ecosystems. Although these studies collectively enhance our understanding of how riverine ecosystems respond to dam removal, knowledge gaps remain because most studies have been short (< 5 years) and do not adequately represent the diversity of dam types, watershed conditions, and dam‐removal methods in the U.S.

1 January 2015 in Geomorphology
Verified
Journal Article
Closed access
AEAmy E. East
Amy E. East
GPGeorge R. Pess
George R. Pess
JBJennifer A. Bountry
Jennifer A. Bountry
CMChristopher S. Magirl
Christopher S. Magirl
ARAndrew C. Ritchie
Andrew C. Ritchie
PSPatrick B. Shafroth
Patrick B. Shafroth

1 October 2015 in Geomorphology
Verified
Journal Article
Closed access
JWJonathan A. Warrick
Jonathan A. Warrick
JBJennifer A. Bountry
Jennifer A. Bountry
AEAmy E. East
Amy E. East
CMChristopher S. Magirl
Christopher S. Magirl
Timothy RandleTimothy Randle
Timothy Randle
JDJeffrey Duda
Jeffrey Duda

1 October 2015 in Geomorphology
Verified
Journal Article
Closed access
Timothy RandleTimothy Randle
Timothy Randle
JBJennifer A. Bountry
Jennifer A. Bountry
ARAndrew Ritchie
Andrew Ritchie
KWKurt Wille
Kurt Wille

5 September 2018 in Scientific Reports
Verified
Journal Article
Open access
PDF file
ARAndrew C. Ritchie
Andrew C. Ritchie
JWJonathan A. Warrick
Jonathan A. Warrick
AEAmy E. East
Amy E. East
CMChristopher S. Magirl
Christopher S. Magirl
ASAndrew W. Stevens
Andrew W. Stevens
AOAndrea S. Ogston
Andrea S. Ogston
Sediment pulses can cause widespread, complex changes to rivers and coastal regions. Quantifying landscape response to sediment-supply changes is a long-standing problem in geomorphology, but the unanticipated nature of most sediment pulses rarely allows for detailed measurement of associated landscape processes and evolution. The intentional removal of two large dams on the Elwha River (Washington, USA) exposed ~30 Mt of impounded sediment to fluvial erosion, presenting a unique opportunity to quantify source-to-sink river and coastal responses to a massive sediment-source perturbation. Here we evaluate geomorphic evolution during and after the sediment pulse, presenting a 5-year sediment budget and morphodynamic analysis of the Elwha River and its delta. Approximately 65% of the sediment was eroded, of which only ~10% was deposited in the fluvial system. This restored fluvial supply of sand, gravel, and wood substantially changed the channel morphology. The remaining ~90% of the released sediment was transported to the coast, causing ~60 ha of delta growth. Although metrics of geomorphic change did not follow simple time-coherent paths, many signals peaked 1–2 years after the start of dam removal, indicating combined impulse and step-change disturbance responses.

1 October 2015 in Geomorphology
Verified
Journal Article
Closed access
AEAmy E. East
Amy E. East
GPGeorge R. Pess
George R. Pess
JBJennifer A. Bountry
Jennifer A. Bountry
CMChristopher S. Magirl
Christopher S. Magirl
ARAndrew C. Ritchie
Andrew C. Ritchie
PSPatrick B. Shafroth
Patrick B. Shafroth