Wan Noorul Hafilah Wan Ariffin

Mrs. Wan Noorul Hafilah Wan Ariffin

Civil Engineering, Universiti Tenaga Nasional, Putrajaya, Malaysia
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
SOSiti Mariam Allias Omar
Siti Mariam Allias Omar
Wan Noorul Hafilah Wan AriffinWan Noorul Hafilah Wan Ariffin
Wan Noorul Hafilah Wan Ariffin
LSLariyah Mohd Sidek
Lariyah Mohd Sidek
HBHidayah Basri
Hidayah Basri
MKMohd Hazri Moh Khambali
Mohd Hazri Moh Khambali
ALI NAJAH AHMEDALI NAJAH AHMED
ALI NAJAH AHMED
Extensive hydrological analysis is carried out to estimate floods for the Batu Dam, a hydropower dam located in the urban area upstream of Kuala Lumpur, Malaysia. The study demonstrates the operational state and reliability of the dam structure based on hydrologic assessment of the dam. The surrounding area is affected by heavy rainfall and climate change every year, which increases the probability of flooding and threatens a dense population downstream of the dam. This study evaluates the adequacy of dam spillways by considering the latest Probable Maximum Precipitation (PMP) and Probable Maximum Flood (PMF) values of the concerned dams. In this study, the PMP estimations are applied using comparison of both statistical method by Hershfield and National Hydraulic Research Institute of Malaysia (NAHRIM) Envelope Curve as input for PMF establishments. Since the PMF is derived from the PMP values, the highest design flood standard can be applied to any dam, ensuring inflow into the reservoirs and limiting the risk of dam structural failure. Hydrologic modeling using HEC-HMS provides PMF values for the Batu dam. Based on the results, Batu Dam is found to have 200.6 m3/s spillway discharge capacities. Under PMF conditions, the Batu dam will not face overtopping since the peak outflow of the reservoir level is still below the crest level of the dam.

27 February 2025 in PLOS ONE
Verified
Journal Article
Open access
PDF file
Wan Noorul Hafilah Wan AriffinWan Noorul Hafilah Wan Ariffin
Wan Noorul Hafilah Wan Ariffin
LSLariyah Mohd Sidek
Lariyah Mohd Sidek
HBHidayah Basri
Hidayah Basri
NINoorhayati Idros
Noorhayati Idros
MAM. Torres Adrian
M. Torres Adrian
ALI NAJAH AHMEDALI NAJAH AHMED
ALI NAJAH AHMED
Climate change poses an escalating threat to the safety of high-hazard embankment dams, increases flood discharge impacting dam overtopping risk by altering the hydrological load of the original dam designed capacity. This paper’s primary aims are to evaluate climate change’s influence on extreme rainfall events and their impact on dam safety and to assess the overtopping risk of Batu Dam under various climate scenarios. This study focusses on assessing the overtopping risk of Batu Dam in Malaysia, utilizing regional climate model projections from the Coupled Model Intercomparison Project 5 (CMIP5) spanning 2020 to 2100. Three Representative Concentration Pathways (RCPs)—RCP4.5, RCP6.0, and RCP8.5 as the scenario and divide into 3 period of study: early century (2020–2046), mid (2047–2073) and late-century (2074–2100) evaluated with hydrological analysis to access the dam safety. Using the Linear Scaling Method (LSM), we corrected the bias projection rainfall data from three Regional Climate Models (RCMs) for the RCPs. Future Probable Maximum Precipitation (PMP) was estimated using statistical analysis techniques developed by the National Hydraulic Research Institute of Malaysia (NAHRIM). Additionally, Rainfall Intensity-Duration-Frequency (IDF) curves were updated based on climate scenarios outlined in the Hydrological Procedure 2021 and the associated Climate Change Factors. The HEC-HMS hydrological model was employed to simulate PMF and IDF for ARIs ranging from 1 to 100,000 years, providing a comprehensive analysis of risks under future climatic conditions. Across all future climate scenarios, inflow events were projected to exceed the dam design inflow, with RCP8.5 indicating the highest inflow values, particularly later in the century, highlighting probability of overtopping risks. Late-century projections show inflow for ARI 50 under RCP8.5 exceeding PMF by 20%, while mid-century RCP6.0 results indicate a 15% higher inflow for ARI 50000. Early-century RCP4.5 shows a 10% increase for ARI 100000 compared to PMF. The study advocates adaptive dam safety management and flood protection measures. This research provides crucial insights for embankment dam owners, stressing the urgent need to address Batu Dam’s vulnerability to extreme flooding amidst climate change and emphasizing proactive measures to fortify critical infrastructure and protect downstream communities.

30 September 2025 in Water
Verified
Journal Article
Open access
PDF file
Wan Noorul Hafilah Wan AriffinWan Noorul Hafilah Wan Ariffin
Wan Noorul Hafilah Wan Ariffin
LSLariyah Mohd Sidek
Lariyah Mohd Sidek
HBHidayah Basri
Hidayah Basri
AMAdrian Morales-Torres
Adrian Morales-Torres
ALI NAJAH AHMEDALI NAJAH AHMED
ALI NAJAH AHMED
NBNurul Iman Ahmad Bukhari
Nurul Iman Ahmad Bukhari
Climate change is intensifying hydrological extremes, posing growing threats to the safety and operational reliability of embankment dams worldwide, particularly those in regions susceptible to heavy rainfall and flooding. This study evaluates the overtopping risk for Batu Dam, a critical flood mitigation and water supply structure near Kuala Lumpur, Malaysia, under future climate scenarios, with the aim of informing risk-informed dam safety strategies. Using historical hydrological data (1975–2020) and downscaled climate projections from the CMIP5 database under three Representative Concentration Pathways (RCP4.5, RCP6.0, RCP8.5), we conducted flood routing simulations and probabilistic risk assessments employing the iPRESAS software. Our results demonstrate that the annual probability of overtopping increases substantially under higher-emission scenarios, reaching up to 0.08% by the late century under RCP8.5, driven by increased frequency and intensity of extreme rainfall events. These projections highlight significant spillway capacity limitations and underscore the heightened risk of downstream consequences, including economic losses exceeding RM 200 million and potential loss of life surpassing 2900 individuals in worst-case scenarios. The findings confirm the urgent need for both structural adaptations, such as spillway expansion and crest elevation, and non-structural measures, including enhanced real-time monitoring and early warning systems. This integrated approach offers a robust and replicable framework for strengthening dam safety under evolving climate conditions.