Yasir Mahmoud

Dr. Yasir Mahmoud

China University of Petroleum, Beijing, Beijing, China
+2

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2022 in Journal of Natural Gas Science and Engineering
Verified
Journal Article
Closed access
XYXiong Yin
Xiong Yin
KWKai Wen
Kai Wen
YWYan Wu
Yan Wu
XHXu Han
Xu Han
Yasir MahmoudYasir Mahmoud
Yasir Mahmoud
JGJing Gong
Jing Gong

1 October 2019 in Fuel
Verified
Journal Article
Closed access
FZFan Zhang
Fan Zhang
Yasir MahmoudYasir Mahmoud
Yasir Mahmoud
BLBen Liu
Ben Liu
JLJiajun Li
Jiajun Li

23 August 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
WSWeidong Sun
Weidong Sun
JZJialu Zhang
Jialu Zhang
Yasir MahmoudYasir Mahmoud
Yasir Mahmoud
LZLili ZUO
Lili ZUO
SDShao-Hua Dong
Shao-Hua Dong
As the lifeline of offshore oil and gas production, a submarine pipeline requires regular safety evaluations with proper maintenance according to the evaluation results. At present, the safety factors based on regional-level commonly used factors in engineering are too many, and this leads to conservative evaluation results with a low acceptance of defects. In this paper, a risk factor evaluation index system for submarine pipeline defects is constructed through an analytic hierarchy process (AHP), and the original safety factors are corrected to achieve accurate evaluations for submarine pipeline safety. By constructing a radial basis neural network (RBFNN), the fast calculation of safety factors for other pipeline defects can be realized. Through comparison, it was found that the values obtained by the machine training were in good agreement with the real values, which reflects the accuracy of the model and provides a basis for the repair of a defective pipeline.

29 March 2023 in Iraqi Journal of Chemical and Petroleum Engineering
Verified
Journal Article
Open access
PDF file
AAAli K. Al-Delfi
Ali K. Al-Delfi
FAFaleh H. M. Al-Mahdawi
Faleh H. M. Al-Mahdawi
Yasir MahmoudYasir Mahmoud
Yasir Mahmoud
YBYousif Eltahir Bagadi
Yousif Eltahir Bagadi
One of the challenging issues encountered during drilling operations is the lost circulation. Numerous issues might arise because of losses, such as wasting of time and higher drilling cost. Several types of lost circulation materials have been developed and are being used to limit mud losses and avoid associated issues. Each solution has benefits and drawbacks. In this study, a core flooding test was performed to study the effectiveness of polyacrylamide (PAM) granular gel on the reduction of the circulation lost. One common type of fracture characteristic is fractures with tips, commonly known as partially open fracture (POF). However, PAM gel therapy in POFs received little attention in prior research. Models of partly open fractures were built using a cylindrical core. A series of processes are performed on a core to get a POF model. Overall, the PAM gel can decrease plug permeability, making it a useful material for lost circulation. The results indicate that the Polyacrylamide granular gel can decrease the permeability up to 193 times.

30 March 2024 in Iraqi Journal of Chemical and Petroleum Engineering
Verified
Journal Article
Open access
PDF file
SASajjad H. Al-Adliy
Sajjad H. Al-Adliy
FAFaleh H. M. Al-Mahdawi
Faleh H. M. Al-Mahdawi
EMElhassan M. A. Mohammed
Elhassan M. A. Mohammed
Yasir MahmoudYasir Mahmoud
Yasir Mahmoud
Increasing oil production from a reservoir can be achieved by decreasing the distance between the injector and the producer through a process known as infill drilling, which involves a pattern water flood. The main objective of this study is to provide a comprehensive overview of the optimal infill well location and the research and applications available to enhance the oil recovery factor, leading to increased economic profits. one effective empirical approach used in this study is based on decline curve analysis, which analyzes the production history of the well to determine the final economic recovery. Additionally, a numerical method that combines numerical simulation and optimization techniques has been proven to be successful in determining optimal infill drilling locations. The research results show that the volumetric computation of oil in place is a useful method for estimating the number of infill wells needed, but it does not consider heterogeneity and continuity. On the other hand, the numerical simulation and optimization techniques can quantify the remaining mobile oil post-infill drilling and establish optimal pattern configurations for maximum recovery at their centers.

11 October 2023 in International Journal of Petroleum Technology
Verified
Journal Article
Open access
PDF file
RBRaddad S. Bahuda
Raddad S. Bahuda
EAElhassan M. Abdallah
Elhassan M. Abdallah
Yasir MahmoudYasir Mahmoud
Yasir Mahmoud
WKWaqar A. Khan
Waqar A. Khan
Beam pumping units were among the first and are still among the most widely used artificial lift systems. This study investigates the components of beam pumping units and the manufacturing mechanism and design procedure recommended by Recommended Practice and the QRod simulator. The API provides API RP 11L Recommended Practice to obtain the values and operating characteristics for each component in dimensionless form. A trial-and-error method is used during the design procedures to determine the best surface and subsurface equipment for a given well's data. When completing a well, the artificial lift method must be considered to ensure that the well is able to be produced at a satisfactory rate. Besides, the procedures created nine cases to compare the requirements of different production rates and depths for a heavy oil well with 14 APIs. A depth of 5,000 ft with a rate of 300 bbl/day and a depth of 7,000 ft with a rate of 500 bbl/day is the specific production rate and depths at which the well will produce. For 300 BBL/Day the tubing size selected was 2-7/8” OD, for this size the suitable plunger size is 2”, and the suitable stroke length was 74in. In cases 6, 8, and 9, all the simulated rod strings were unable to handle the stress imposed by the combination of high depth and high production rate. As a result, all designed systems will fail during production.