Research Focus & Metrics

Academic Career Length

24Years (2003-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2010 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
MAMohamed Abdelgawad
Mohamed Abdelgawad
Aminah Robinson FayekAminah Robinson Fayek
Aminah Robinson Fayek
Failure mode and effect analysis (FMEA) is recognized as one of the most beneficial techniques in reliability programs. FMEA is a structured technique that can help in identifying all failure modes within a system, assessing their impact, and planning for corrective actions. Although this technique has been widely used in many industries, it has some limitations. The purpose of this paper is to extend the application of FMEA to risk management in the construction industry. Fuzzy logic and fuzzy analytical hierarchy process (AHP) are used to address the limitations of traditional FMEA. In essence, this method explores the concept of fuzzy expert systems to map the relationship between impact (I), probability of occurrence (P), and detection/control (D) and the level of criticality of risk events. A case study is presented to validate the concept. The results obtained confirm the capability of fuzzy FMEA and fuzzy AHP to address several drawbacks of the traditional FMEA application. The use of this approach...

19 March 2010 in Computer-Aided Civil and Infrastructure Engineering
Verified
Journal Article
Open access
PDF file
NSN. Sadeghi
N. Sadeghi
Aminah Robinson FayekAminah Robinson Fayek
Aminah Robinson Fayek
WPW. Pedrycz
W. Pedrycz
Monte Carlo simulation has been used extensively for addressing probabilistic uncertainty in range estimating for construction projects. However, subjective and linguistically expressed information results in added non-probabilistic uncertainty in construction management. Fuzzy logic has been used successfully for representing such uncertainties in construction projects. In practice, an approach that can handle both random and fuzzy uncertainties in a risk assessment model is necessary. This article discusses the deficiencies of the available methods and proposes a Fuzzy Monte Carlo Simulation (FMCS) framework for risk analysis of construction projects. In this framework, we construct a fuzzy cumulative distribution function as a novel way to represent uncertainty. To verify the feasibility of the FMCS framework and demonstrate its main features, the authors have developed a special purpose simulation template for cost range estimating. This template is employed to estimate the cost of a highway overpass project.

1 July 2020 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
Aminah Robinson FayekAminah Robinson Fayek
Aminah Robinson Fayek

1 April 2007 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
ASAhmed A. Shaheen
Ahmed A. Shaheen
Aminah Robinson FayekAminah Robinson Fayek
Aminah Robinson Fayek
SASimaan Abourizk
Simaan Abourizk
Range estimating is a simple form of simulating a project estimate by breaking the project into work packages and approximating the variables in each package using statistical distributions. This paper explores an alternate approach to range estimating that is grounded in fuzzy set theory. The approach addresses two shortcomings of Monte Carlo simulation. The first is related to the analytical difficulty associated with fitting statistical distributions to subjective data, and the second relates to the required number of simulation runs to establish a meaningful estimate of a given parameter at the end of the simulation. For applications in cost estimating, the paper demonstrates that comparable results to Monte Carlo simulation can be achieved using the fuzzy set theory approach. It presents a methodology for extracting fuzzy numbers from experts and processing the information in fuzzy range estimating analysis. It is of relevance to industry and practitioners as it provides an approach to range estimati...

1 April 2011 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
MAMohamed Abdelgawad
Mohamed Abdelgawad
Aminah Robinson FayekAminah Robinson Fayek
Aminah Robinson Fayek
Fault trees are deductive techniques constructed by taking a system failure event and deconstructing it into its root causes (basic events, gate events). Fault trees can be solved qualitatively, by determining minimal cut sets, and quantitatively, by calculating the probability of occurrence of the risk event. In conventional fault-tree analysis (FTA), the probability of occurrence for all basic events must be assessed in order to allow for quantitative fault-tree analysis. However, conducting quantitative fault-tree analysis, especially in construction projects, entails several difficulties owing to the lack of sufficient data, leading to an approximation of the probability of occurrence for some basic events. Assuming probabilities for any basic event will add further uncertainty to the analysis, resulting in a potentially questionable end result. To overcome the challenge of assessing probabilities, this paper presents a comprehensive framework in which experts can use linguistic terms rather than nume...

1 September 2018 in Journal of Computing in Civil Engineering
Verified
Journal Article
Closed access
MRMohammad Raoufi
Mohammad Raoufi
Aminah Robinson FayekAminah Robinson Fayek
Aminah Robinson Fayek
Recently, agent-based modeling (ABM) has been used to model construction processes and practices because it is capable of handling some of the complexities that arise from the interactions of system components. However, ABM alone cannot take into account the subjective uncertainty that exists in many construction systems. In this paper, a methodology for the development of fuzzy agent-based models in construction is provided, and its application is illustrated using a case study modeling construction crew motivation and performance. This paper makes three contributions: first, it expands ABM’s scope of applicability by integrating it with fuzzy logic to create fuzzy agent-based modeling (FABM) in construction, which can handle both probabilistic and subjective uncertainty; second, it provides a novel methodology for developing fuzzy agent-based models, allowing for the development of new models to assess construction processes and practices; and third, it develops a fuzzy agent-based model of construction crew motivation and performance, which improves the assessments of performance by considering not only the interactions of crews in the project, but also the subjective uncertainty in model variables.