Aleksandra Parezanović

Ms. Aleksandra Parezanović

Department of Construction Project Management, University of Belgrade-Faculty of Civil Engineering, Belgrade, Beograd, Serbia
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 December 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
Z*Zorana Petojević *
Zorana Petojević *
MSMilica Savić
Milica Savić
APAleksandra Parezanović
Aleksandra Parezanović
ANAna Nadazdi
Ana Nadazdi
Construction, one of the largest global economic sectors, has been severely challenged by the economic uncertainties brought on by COVID-19. Since 2020, pandemic-related disruptions and remedial measures have made its historically low performance even more difficult. As a result, recent research mainly addressed these negative consequences on the construction sector. In contrast, this paper aims to identify mitigation strategies recognised as good practices on construction projects in Serbia, in addition to detecting disruptions and quantifying their effects on cost and time overruns. A particular emphasis is given to how the pandemic hastened digital transition and encouraged the adoption of modern project management practices. The research was carried out through a survey of two rounds, conducted one year apart, to obtain an in-depth overview. The findings indicated that, although it had an impact on construction projects, the pandemic was not particularly harmful, because of widely used remedial measures and modern project management techniques. However, the pandemic did not modernise project implementation substantially nor significantly increase the use of cutting-edge digital technologies. Nevertheless, it encouraged project managers to think about introducing new approaches in project management, where digitisation is the new normal. The research findings may indicate to academia and practitioners what strategies may assure a project’s implementation even in enormously changed conditions, such as during a pandemic.

15 October 2026
Verified
Book Chapter
Open access
PDF file
MNMilica Nikolić
Milica Nikolić
APAleksandra Parezanović
Aleksandra Parezanović
ZPZorana Petojević
Zorana Petojević
ANAna Nadazdi
Ana Nadazdi
Achieving a circular built environment requires reliable methods for assessing existing buildings as material banks at the end-of-life, yet most circularity indicators are developed primarily for the early design phase. Even those indicators intended for end-of-life assessments remain insufficiently validated. This study examines how different circularity indicators describe the same existing building when applied under identical data constraints and system boundaries, enabling a controlled comparison of scenario-based end-of-life circularity assessments. Three frequently cited end-of-life indicators were applied to a 1930s residential building in Belgrade, Serbia, using a single and consistent material inventory derived from archival documentation and BIM-based quantification. The results show relatively high agreement between the compared MCI-based approaches at the material level, but substantial differences at the element, system, and building levels. This confirms that circularity indicators are not interchangeable and that their interpretation depends strongly on the assessment level, data availability, and methodological assumptions. While such assessments may be feasible for individual existing buildings to some extent, their application to neighborhood-scale studies remains limited without simplified input requirements and standardized calculation procedures.