22 December 2017 in IEEE Transactions on Power Systems
This paper analyzes the benefits of dynamic line rating (DLR) in the system with high penetration of wind generation. A probabilistic forecasting model for the line ratings is incorporated into a two-stage stochastic optimization model. The scheduling model, for the first time, considers the uncertainty associated with wind generation, line ratings, and line outages to co-optimize the energy production and reserve holding levels in the scheduling stage as well as the redispatch actions in the real-time operation stage. Therefore, the benefits of higher utilization of line capacity can be explicitly balanced against the costs of increased holding and utilization of reserve services due to the forecasting error. The computational burden driven by the modeling of multiple sources of uncertainty is tackled by applying an efficient filtering approach. The case studies demonstrate the benefits of the DLR in supporting cost-effective integration of high penetration of wind generation into the existing network. We also highlight the importance of simultaneously considering the multiple sources of uncertainty in understanding the benefits of DLR. Furthermore, this paper analyzes the impact of different operational strategies, the coordination among multiple flexible technologies, and the installed capacity of wind generation on the benefits of DLR.
8 January 2019 in IEEE Transactions on Power Systems
Real-time current-carrying capacity of overhead conductors is extremely variable due to its dependence on weather conditions, resulting in the use of traditionally conservative static ratings. This paper proposes a methodology for exploiting the latent current-carrying capacity of overhead transmission lines taking into account line ampacity forecasts, power flow simulations and the network operator's risk aversion. The procedure can be described as follows: Firstly, probabilistic forecasts for the current rating of transmission lines are generated, paying particular attention to the reliability of the lower part of the distribution. Secondly, a cost benefit analysis is carried out by solving a bilevel stochastic problem that takes into account the reduction in generation costs resulting from a higher power transfer capacity and the increased use of reserves caused by forecast errors. The risk appetite of the network operator is considered in order to accept or penalize high-risk situations, depending on whether the network operator can be described as risk neutral or risk averse.