Ivana Burcar Dunović

Ivana Burcar Dunović

Auto-generated profile, based on publicly available information

Ivana Burcar Dunović

Faculty of Civil Engineering, University of Zagreb, 10000 Zagreb, Croatia

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 December 2010 in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Verified
Journal Article
Open access
MRMladen Radujković
Mladen Radujković
Mladen VukomanovicMladen Vukomanovic
Mladen Vukomanovic
IDIvana Burcar Dunović
Ivana Burcar Dunović
The importance of performance based benchmarking has become a necessity in a modern construction company and presents a constant challenge for the construction industry. The aim of this paper is to elaborate significance, role and types of Key Performance Indicators (KPI) in the construction industry and show how different management perspectives perceive the indicators. A literature review was carried out in order to generate a listing of KPIs, used among academe and the industry. Afterwards, using surveys and semi‐structured interviews, the data was gathered from more than 30 South‐East European construction companies. Results were analyzed, producing a final set of 37 indicators. This study identified a low level of awareness of KPI models and performance management processes among the companies. Furthermore, the analysis showed a substantial difference in perception of KPIs among investors, consultants and contractors, which consequently led to a compiling list of KPIs. The top ten KPI's are: Quality, Cost, Number of investor interferences, Changes in project support, Time increase, Client satisfaction, Employees’ satisfaction, Innovation and learning, Time and Identification of client's interest. The paper concludes with final remarks and guidelines for the implementation of KPIs in practice. Santrauka Šiuolaikineje statybos imoneje efektyvumu pagristo lyginimo svarba jau yra neišvengiama, o statybu pramonei tai reiškia nuolatinius iššūkius. Šiuo darbu siekiama išnagrineti pagrindiniu statybu sektoriaus veiklos rodikliu (PVR) reikšme, vaidmeni ir rūšis bei pademonstruoti, kaip šie rodikliai vertinami remiantis skirtingais vadybos požiūriais. Apžvelgta literatūra, siekiant sudaryti akademineje aplinkoje ir pramoneje naudojamu PVR saraša. Pasitelkus apklausas ir iš dalies struktūrinius pokalbius, buvo surinkti duomenys iš daugiau kaip 30 pietryčiu Europos statybos imoniu. Išanalizavus rezultatus gautas galutinis 37 rodikliu rinkinys. Šiame tyrime nustatyta, kad imones menkai ka težino apie PVR modelius ir efektyvumo valdymo procesus. Be to, paaiškejo, kad investuotojai, konsultantai ir rangovai PVR suvokia gana skirtingai, ir del to teko sudaryti PVR saraša. Dešimt pagrindiniu PVR yra šie: kokybe, kaina, investuotojo kišimosi atveju skaičius, pasikeitusi parama projektui, nukelti terminai, kliento pasitenkinimas, darbuotoju pasitenkinimas, naujoves ir mokymasis, laikas, kliento interesu nustatymas. Darbo pabaigoje pateikiamos baigiamosios pastabos ir PVR taikymo praktikoje rekomendacijos.

1 March 2014 in Procedia - Social and Behavioral Sciences
Verified
Journal Article
Open access
IDIvana Burcar Dunović
Ivana Burcar Dunović
MRMladen Radujković
Mladen Radujković
KŠKristina Ana Škreb
Kristina Ana Škreb
When talking about large infrastructure projects one can often hear – “it is a very complex project”. What does it mean? What makes large infrastructure projects complex? This paper is exploring current views on project complexity and its development though history. As part of the research on large infrastructure projects, the perception and elements of complexity was investigated. The research is based on in-depth analysis of large infrastructure projects and project manager's perception of complexity. The result of the paper is proposal of new model of project complexity for large infrastructure projects

17 May 2016 in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Verified
Journal Article
Open access
PDF file
IDIvana Burcar Dunovic
Ivana Burcar Dunovic
MRMladen Radujkovic
Mladen Radujkovic
MVMladen Vukomanovic
Mladen Vukomanovic
The level of sensitivity to project success of large infrastructure projects is significantly greater in front-phase than in execution phase. Yet, due to focus on execution phase, methods for project assessment and on-going evaluation during front phases are insufficiently developed. On the other hand, risk management approaches has been moved from risk management towards holistic uncertainty management which is the most beneficial in front end phase of the project. This research identifies that majority of methods and techniques available does not support uncertainty management concept. The purpose of this paper is to develop and new method for risk based project assessment and evaluation inte­grating risk impact modelling using cumulative distribution curves (CDC) and multi-criteria project evaluation approach. Research is based on in-depth risk analysis of 15 large infrastructure projects using risk model of components and char­acteristics. The conclusion of the paper is verification and validation of method that combines qualitative and quantita­tive analysis using risk components, risk breakdown structure, AHP method and risk impact modelling using cumulative distribution curves (CDC) for internal and external risk based assessment and evaluation of large infrastructure projects.

21 October 2020 in Energies
Verified
Journal Article
Open access
PDF file
SGSanjin Gumbarević
Sanjin Gumbarević
IDIvana Burcar Dunović
Ivana Burcar Dunović
Bojan MilovanovicBojan Milovanovic
Bojan Milovanovic
MGMergim Gaši
Mergim Gaši
With the increasing number of nearly zero-energy buildings (NZEB) due to increase of global awareness on climate change, the new concepts of design and control must be developed because of great NZEB dependency on detailing and multidisciplinary approach. This paper proposes a three-level gateway control method for NZEB project delivery by using digital representation of the building in building information modeling (BIM) environment. These controls (C1, C2 and C3) are introduced before three main phases of any project delivery—design phase, construction phase and handover. The proposed project control procedure uses black-box building energy modeling within the BIM environment, so the paper explores the reliability of one tool for direct energy modeling within the BIM-authoring software. The paper shows two types of validation tests with satisfactory results. This leads to conclusion that analyzed tool for energy simulation within BIM environment can be used in a way that is described in a proposed project control procedure. For further research it is proposed to explore reliability of tools for energy simulation connected to other BIM-authoring software, so this project control procedure could be independent of BIM-authoring software used in the paper.

11 September 2017
Verified
Conference Paper
Open access
KPKristijan Robert Prebanic
Kristijan Robert Prebanic
IDIvana Burcar Dunovic
Ivana Burcar Dunovic
Large construction projects affect a considerable number of stakeholders who may have differring interests, needs and requirements, and there is a real danger of creating opposition and endangering project execution. Various tools and methods have been developed for the analysis, identification and engagement of stakeholders. However, construction project managers still have the problem of meeting demands of numerous stakeholders. Therefore, on major construction projects, there is a need for elaboration of comprehensive guidelines that would enable project managers to systematically analyze relevant features of stakeholders (their interests, needs, attitudes, etc.), on which basis a proper strategy for stakeholder engagement on the project would be formed.