24 February 2019 in IOP Conference Series: Materials Science and Engineering
The classic triad "owner-architect-general contractor" are the main participants of traditional projects. They make contracts that regulate the rights and obligations of the parties and establish procedures for solving the entire range of issues during the operation of contractual relations. However, modern projects, especially large ones, require a wide range of participants. Taking into account the large number of project participants, it becomes very important to optimize the cooperation between them. The problems with communication leads to the division of the construction process to the stages, the significant number of changes and non-operating costs, and as a result to the increased project duration and increased costs. The research analyzes the core, characteristics and principles of the Integrated Project Delivery (IPD) and establishes the connection between it and the traditional project delivery methods. The IPD accumulates some of their special features and becomes the next stage in the evolution of the construction industry. One of the main characteristics of the Integrated Project Delivery is an early involvement of key participants, based on the following principles: early involvement, early goal definition, intensified planning, and organization and leadership. The aim of the research is to compare the effectiveness of the traditional project delivery methods and the Integrated Project Delivery by the criterion of the total cost for project modification. Methods of mathematical modeling were used to compare the effectiveness of the various project delivery methods. Thus, such curves and functions of dependence were modeled: between the increase in the cost of the project modifications and the period of their delivery; between the intensity of changes made to the project and the time when traditional project delivery methods are used; between the intensity of project modifications and the time on application of the Integrated Project Delivery. By means of the integral calculus (Simpson's rule) it was determined the total cost of the project modifications, which is a function of the method of project delivery and the cost of making the appropriate changes. The result of the calculations proves that the use of the integrated project delivery model reduces the total cost of making changes by 33%.
24 June 2021 in Archives of Civil Engineering
Recent research has shown that the increase in a number of participants of construction project elevated the cost and duration of construction. The use of integrated project delivery and the formation of a network organization structure can significantly reduce the costs, as the activities of the participants become more coherent and coordinated. The optimization of decisions is essential for the efficiency of a negotiation process, which in turn depends on the organizational structure. The article specifies three basic types of network organizational structure that can be applied in a construction project: focal (F1), dynamic (F2), multifocal (F3). In this study, a direct assessment of possible effectiveness of each of the three types of network organizational structures was carried out using a vector decision model. For each of the above-mentioned types of organizational structures, the potential effectiveness of negotiating act f0 and the total potential effectiveness F0 was calculated. The results of the study show that the most effective type of network organizational structure is the multifocal collective decisions in which a project manager has several “assistants”.
1 January 2017 in International Journal of Risk Assessment and Management
Ukraine is an agrarian state. One of the most important branches of agriculture sector is grain production. High yield of grain is a basis of Ukrainian food security. Therefore the task of developing a reliable mathematical model forecasting the grain production profitability is urgent. Regression analysis and fuzzy simulation principles have been used for building a grain production profitability depending model from crop production in the last two years, average price of grain in the country and grain production costs. The values of profitability forecasting for 2015 obtained by three different methods are convergent to each other. Contribution of factors' changes such as yield, the price of grain and the cost of grain production into fluctuation of grain production profitability have been also analysed.
27 December 2018 in Metody Ilościowe w Badaniach Ekonomicznych