19 February 2009 in Journal of Geodesy
27 April 2011 in Journal of Geodesy
7 May 2020 in GPS Solutions
The earth rotation parameters (ERPs) are time-variable global geodetic parameters with a purely geophysical origin. Theoretically, the estimates of these parameters should be independent of the satellite constellation used in GNSS processing. Nonetheless, clear differences in the time series of ERPs are noticed when using different GNSS constellations. In this study, GPS, GLONASS, and Galileo estimates of ERP have been extensively evaluated in search of system-specific signals. Some of the processing details, such as modeling of the direct solar radiation pressure and length of the orbital arc, also have an impact on the ERP estimates. The GPS-based polar motion estimates are of better quality than those based on GLONASS and Galileo, which are susceptible to deficiencies in the orbit modeling. On the other hand, we observe a systematic bias of GPS-based length-of-day (LoD) with respect to the IERS-C04-14 values with a mean offset of − 22.4 µs/day. The Galileo-based solutions are almost entirely free of this issue. The extension of the orbital arc in the GNSS processing from 1 to 3 days is superior for the quality of the ERPs, especially for pole coordinate rates and LoD. The spurious signals inherently influence the Galileo-based and GLONASS-based ERPs at the frequencies which arise from the resonance between the satellite revolution period and earth rotation, e.g., 3.4 days for Galileo and 3.9 days for GLONASS. These and the draconitic signals overshadow the GNSS-based ERP estimates. Although all the system-specific solutions are affected by the artificial signals, the combination of different GNSS mitigates most of the uncertainties and improves the ERP results.
22 October 2010 in Journal of Geodesy
In recent years, several studies have demonstrated the sensitivity of Global Navigation Satellite System (GNSS) station time series to displacements caused by atmospheric pressure loading (APL). Different methods to take the APL effect into account are used in these studies: applying the corrections from a geophysical model on weekly mean estimates of station coordinates, using observation-level corrections during data analysis, or solving for regression factors between the station displacement and the local pressure. The Center for Orbit Determination in Europe (CODE) is one of the global analysis centers of the International GNSS Service (IGS). The current quality of the IGS products urgently asks to consider this effect in the regular processing scheme. However, the resulting requirements for an APL model are demanding with respect to quality, latency, and—regarding the reprocessing activities—availability over a long time interval (at least from 1994 onward). The APL model of Petrov and Boy (J Geophys Res 109:B03405, 2004) is widely used within the VLBI community and is evaluated in this study with respect to these criteria. The reprocessing effort of CODE provides the basis for validating the APL model. The data set is used to solve for scaling factors for each station to evaluate the geophysical atmospheric non-tidal loading model. A consistent long-term validation of the model over 15 years, from 1994 to 2008, is thus possible. The time series of 15 years allows to study seasonal variations of the scaling factors using the dense GNSS tracking network of the IGS. By interpreting the scaling factors for the stations of the IGS network, the model by (2004) is shown to meet the expectations concerning the order of magnitude of the effect at individual stations within the uncertainty given by the GNSS data processing and within the limitations due to the model itself. The repeatability of station coordinates improves by 20% when applying the effect directly on the data analysis and by 10% when applying a post-processing correction to the resulting weekly coordinates compared with a solution without taking APL into account.
1 May 2003 in Journal of Geodesy
1 July 2006 in IEEE Transactions on Ultrasonics, Ferroelectrics, and Frequency Control
We address two issues that limit the quality of time and frequency transfer by carrier phase measurements from the Global Positioning System (GPS). The first issue is related to inconsistencies between code and phase observations. We describe and classify several types of events that can cause inconsistencies and observe that some of them are related to the internal clock of the GPS receiver. Strategies to detect and overcome time-code inconsistencies have been developed and implemented into the Bernese GPS software package. For the moment, only inconsistencies larger than the 20 ns code measurement noise level can be detected automatically. The second issue is related to discontinuities at the day boundaries that stem from the processing of the data in daily batches. Two new methods are discussed: clock handover and ambiguity stacking. The two approaches are tested on data obtained from a network of stations, and the results are compared with an independent time-transfer method. Both methods improve the stability of the transfer for short averaging times, but there is no benefit for averaging times longer than 8 days. We show that continuous solutions are sufficiently robust against modeling and preprocessing errors to prevent the solution from accumulating a permanent bias.