6 October 2024 in Reliability Engineering & System Safety
1 November 2024 in DYNA Ingenieria e Industria
A relevant evaluation index system was established in this study for the objective measurement of emergency management capability for urban flood disasters based on the four stages of emergency response, namely, “prevention, early warning, response, and recovery.” The weight distribution of different evaluation indices was calculated by using the CRITIC method, which generated an evaluation cloud and a result cloud based on the cloud model. A case study on the emergency management of Zhengzhou City in Henan Province of the “7.20 Flood Disaster” was conducted, and the evaluation results were displayed intuitively as the digital features of the cloud model and in the computational cloud diagrams. The evaluation results of the emergency management capability of Zhengzhou City for the “7.20 Flood Disaster” were obtained, and a new direction for emergency management capability improvement was proposed based on a capability enhancement priority matrix. Results showed that Zhengzhou City exhibited only the “simple level - system management mode” in coping with the “7.20 Flood Disaster.” Zhengzhou City can improve its emergency management capability against flood disasters by improving the reliability of its monitoring and communication systems, the effectiveness of its publicity and education measures, and the timeliness of its provision of postdisaster information statistics and reports. The conclusions disclose a new direction for the scientific judgment of emergency management capability for flood disasters and the formulation of capability enhancement strategies. Key Words: Flood disasters; emergency management capability; cloud model; CRITIC method; capability enhancement matrix
27 April 2026 in Evaluation Review
Knowing how to implement emergency material scheduling and transportation during emergency rescues, such as major and critical emergencies, has become a research hotspot in academia and industry in recent years. To leverage the speed and terrain-insensitive advantages of aviation, the weak limitations of geographical conditions must be addressed, and the material scheduling efficiency of aviation rescue centers in disaster-stricken areas needs to be improved. In this study, CRITIC and cloud model theory were integrated to evaluate the urgency of emergency material demands in different flood-stricken areas under catastrophic flood disaster risks. Furthermore, a mathematical model for a single aviation emergency rescue center to dispatch emergency materials to multiple disaster-stricken sites was designed based on the optimized ant colony algorithm. A penalty function was then incorporated to formulate a multi-objective aviation scheduling model, aiming to minimize both total rescue time and total cost. The model was solved using an improved genetic algorithm. Taking rainstorm-induced flood disasters in the megacity of Zhengzhou, China, in 2021 as the empirical research case, the operating paths for the aviation emergency rescue center to serve multiple demand points were optimized. The impact of material demand urgency on scheduling decisions was analyzed. Results revealed that when material demand urgency is considered, aircraft complete deliveries according to urgency rankings and return to the center. All tasks can be completed within the required time via four routes. Although total time increases, economic cost is significantly reduced, and disaster loss is mitigated. The findings obtained from this study provide a decision-making reference for improving the efficiency of aviation emergency rescue and enhancing urban risk management capabilities in response to major and critical emergencies.