Chengdeng Gao

Chengdeng Gao

Auto-generated profile, based on publicly available information

Chengdeng Gao

College of Energy and Mining Engineering, Xi’an University of Science and Technology, Xi’an, China

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 February 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
ZDZiwei DING
Ziwei DING
SWshaoyi wang
shaoyi wang
JLJinglong Liao
Jinglong Liao
LLLiang Li
Liang Li
JJJindui Jia
Jindui Jia
CGChengdeng Gao
Chengdeng Gao
To improve production efficiency and prevent potential disasters in coal mines, comprehensive research methods such as similar simulation, numerical simulation, theoretical analysis, and on-site detection were used in this study. The migration characteristics of overburden rock under different working face lengths and development heights of water-conducting fracture zones were investigated via these methods in order to determine the reasonable length of the working face. The results show that the regularity of the development height of water-conducting fracture zones in similar simulations and numerical simulations is highly consistent, and the final stable values are 48 and 50 m. When the working face length was 300 m, the error between the simulated value and the value calculated from the formula dropped below 10% and exhibited a further decreasing trend; as a result, the working face length of 300 m was found to be the turning point for the development height of the water-conducting fracture zone to become stable. Based on the simulation results and mining damage theory, the critical size of the working face was 307.6 m, and the height of the water-conducting fracture zone was determined to be in the range of 45.5–60.5 m. The actual detection result of the height of the water-conducting fracture zone under the critical size of the working face was 55 m, which conforms to the law obtained from the simulation. Finally, the reasonable working face length under the geological conditions of a coal mine was determined to be 300–400 m. This study offers important reference value for determining the reasonable working face length under similar geological conditions, and may have significance for the sustainable development of coal resource mining.

8 April 2025 in Scientific Reports
Verified
Journal Article
Open access
PDF file
HWHaibin Wang
Haibin Wang
GCGuogang Cui
Guogang Cui
ZSZhen Shi
Zhen Shi
LZLing Zhang
Ling Zhang
CGChengdeng Gao
Chengdeng Gao
ZDZiwei Ding
Ziwei Ding
To evaluate the energy efficiency of tunneling with an open full-section road header constructed in deep coal composite strata, this study relies on the development project of the 1# backdraft tunnel in the western area of a mine located in Binchang, Shaanxi Province. The analysis is based on machine-rock data collected by the Tunnel Boring Machine (TBM) while excavating through various composite strata, including muddy sandstone layers, muddy sandstone and coal composite strata, coal strata, medium-coarse sandstone layers, medium-coarse sandstone, and fine sandstone composite stratum, fine sandstone stratum. Descriptive statistics, correlation analysis, regression analysis, and other Mathematical and statistical methods are used to analyze the change rule of TBM tunneling parameters in different formations, and the optimized regulation range of tunneling parameters is proposed. At the same time, the propulsion factor, tunneling speed, and tunneling specific energy are introduced as the boreability evaluation indexes, and a quantitative identification method of formation boreability level is established to reasonably classify the difficulty level of tunneling in different formations. The results show that: (1) the change characteristics of five main tunneling parameters in different formations are obtained through data preprocessing, and the change trends of tunneling speed and penetration in different formations are consistent, while the change trends of cutter speed, thrust, and torque are opposite to that of penetration. (2) The main tunneling parameters in different formations are analyzed by numerical statistics, and it is found that all of them are normally distributed, and the 25% and 75% position of data distribution is taken to the values of 25% and 75% of the data distribution are given, and the reasonable regulation range of each parameter is given. (3) The two characteristic parameters of thrust factor and tunneling specific energy are introduced to analyze the tunneling energy efficiency of TBM tunneling in different strata, and the variation of the characteristic parameters in a single stratum is small, and the oscillatory nature of them in composite strata is significantly higher than that of a single stratum by a factor ranging from 1.29 to 3.64. (4) The identifying method of the tunneling grade of a strata has been established based on the indicators of the tunneling speed and the energy consumption of tunneling, and a characteristic parameter is proposed to identify the level of the tunneling performance. The identification method of grade is established based on the index of tunneling speed and energy consumption, and the fluctuation correction factor of characteristic parameter is proposed to quantitatively evaluate the degree of difficulty of tunneling in six kinds of strata. The stratum boreability grade identification method proposed in this paper can effectively classify the composite strata under deep and complex geological conditions, and provide important reference and guidance for the assessment and prediction of stratum boreability and optimization of tunneling parameter control in the smooth running section of TBM.