1 April 2024 in Review of Scientific Instruments
The design, development, and successful implementation of pop-up Langmuir probes installed in the water-cooled divertor of W7-X are described. The probes are controlled by drive coils (actuators) installed behind the divertor plates. These drive coils make use of the magnetic field in W7-X to move the probe tips into and out of the plasma. The drive coils were installed in the vacuum vessel after extensively testing the durability of the coils and analyzing the criteria for safe operation. The probe design is carefully tailored for each of the 36 probe tips in order to be suitable for the different magnetic field configurations used in W7-X and ensure that the probes do not present leading edges to the magnetic flux tubes. An electronic bridge circuit is used for measurement to compensate for the effects of signal propagation time on the long cable lengths used. The diagnostic is integrated with the segment control of W7-X for automated operation and control of the diagnostic. The evaluation of the results from the plasma operation is presented after accounting for appropriate sheath expansion for negative bias voltage on the probes.
6 February 2018 in IEEE Transactions on Plasma Science
The largest modular stellarator Wendelstein 7-X (W7-X) has successfully passed the first phase of operation in Greifswald, Germany. The sophisticated W7-X superconducting magnet system (MS) with its nonlinear support system has been carefully monitored using an extensive set of mechanical and temperature sensors. This paper focuses on detailed consideration of cyclic MS behavior during operation with limiter configurations of plasma. Measurement results are carefully compared with predictions from updated numerical models and critical issues are highlighted. As a result, the structural monitoring tool is extended to follow enhanced requirements and expectations. This paper is a preparation for upcoming more demanding phases with longer plasma pulses to guarantee safe and reliable W7-X operation with different divertor and scraper element configurations. The procedure to establish required sensor configurations, and to analyze and release new plasma regimes being compatible with W7-X component design values is also described.
28 June 2019 in Fusion Science and Technology
The largest modular stellarator, the Wendelstein 7-X (W7-X), has completed its second phase of operation, OP1.2, in Greifswald, Germany. The inertially cooled divertor installed between mid-2016 and mid-2017 has allowed a wider range of plasma configurations in comparison with the first operation phase, OP1. The sophisticated W7-X superconducting magnet system is further loaded up to 70% of its maximum design loads for all main components. The extensive set of mechanical sensors clearly shows a highly nonlinear system response, which is in rather good correspondence with the predictions from the available advanced numerical models. However, there are also significant deviations observed in several areas. Therefore, modeling improvements and/or parameter variation analyses are necessary to clarify the issues in preparation for the upcoming, more demanding phase OP2 (2021+) with the actively cooled divertor and longer plasma pulses to guarantee safe and reliable W7-X operation. The updated strategy to release multiple new plasma configurations being compatible with W7-X component design values is described briefly. In this approach, the numerical model linearization in the vicinity of an accurately analyzed point is a key method to accelerate the process and to highlight areas for vacuum field parameters not allowed for plasma operation due to structural criticality. A brief overview of the W7-X measurement results, the observed deviations with numerical models, and the implemented improvements, as well as the lessons learned so far, are presented.
2 March 2020 in IEEE Transactions on Applied Superconductivity
The sophisticated large magnet system of the Wendelstein 7-X (W7-X) stellarator has been operated during first two experimental campaigns at the Max-Planck-Institute for Plasma Physics in Greifswald, Germany, for roughly 13 months. Its 70 superconducting coils (NbTi CCIC) are extraordinary not only due to complex 3D shapes of 50 non-planar coils, but also due to a non-linear support system. In addition, five big resistive coils with the aim to correct W7-X error fields are installed on the outer cryostat and use rubber pads in their supports to compensate thermal expansion of the coils. The structural behavior of the W7-X magnetic system is monitored and evaluated on the basis of the analysis of the signals from the extended set of mechanical and temperature sensors. Several cooldown/warming up and thousands of electromagnetic cycles with different loading patterns and with up to 70% design load magnitude have been performed by the system successfully. The focus of this paper is on the cyclic structural behavior of the W7-X magnet system and the comparison with finite element predictions. Several related issues such as bolts and rubber pads prestress degradation, support slippage development, evolution of mutual coil displacement, loading path dependence of stress levels, sliding weight support (cryoleg) adjustment, and sensor failure are addressed. Lessons learned so far are also briefly summarized.