Phatthawut Kanokwannakhon

Phatthawut Kanokwannakhon

Auto-generated profile, based on publicly available information

Phatthawut Kanokwannakhon

Faculty of Logistics, Burapha University, Mueang Chonburi 20131, Thailand

Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 March 2026 in Sustainable Marine Structures
Verified
Journal Article
Open access
PDF file
PKPhatthawut Kanokwannakhon
Phatthawut Kanokwannakhon
TMThanyaphat Muangpan
Thanyaphat Muangpan
KMKittisak Makkawan
Kittisak Makkawan
Maritime transport faces escalating decarbonization pressure, prompting ports and shipping lines to evaluate onshore power supply (OPS) as a near-term abatement option for hoteling (at-berth) emissions. This study assesses the feasibility of implementing OPS for ship berthing at Bangkok Port, Thailand, using a sequential mixed-methods design. Qualitative evidence from semi-structured interviews with 26 shipping lines and 3 Port Authority of Thailand (PAT) respondents, combined with a Strengths, Weaknesses, Opportunities, and Threats (SWOT)-based contextual assessment, identifies readiness conditions and adoption constraints. A 30-year discounted cash-flow appraisal evaluates investor-side performance (NPV, IRR, and payback) for a pilot at container berths 20A and 20F and tests tariff mark-up sensitivity under 2022–2024 fuel and electricity price conditions. A socio-economic appraisal monetizes avoided air pollutants (PM2.5, NOx, SOx) and CO2 using AIS-based hoteling profiles and recognized emission-factor approaches, and reports EIRR. Results show that OPS is financially unattractive for the port operator in all scenarios (base case: NPV = −4.61 million USD; IRR = −3.38%); breakeven would require an ~115% tariff mark-up, which may reduce uptake. In contrast, the economic case is positive (EIRR = 7.78% at a 7% social discount rate), yielding an estimated net social benefit of 417,885 USD/year and avoiding 885.46 tCO2/year for a pilot demand of ~1.25 GWh/year. These findings indicate a coordination gap between infrastructure investment and vessel uptake, implying a need for targeted public co-financing, transparent tariff design, and phased deployment linked to demonstrated demand. The study contributes policy-relevant evidence for medium-scale ports in emerging policy settings where social benefits may exceed private returns.