Artem Cherniuk

Artem Cherniuk

Auto-generated profile, based on publicly available information

Artem Cherniuk

Ukrainian Engineering Pedagogics Academy

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications

28 February 2023 in European Science
Verified
Journal Article
Open access
KBKostiantyn Brovko
Kostiantyn Brovko
ACArtem Cherniuk
Artem Cherniuk
YOYuliia Oliinyk
Yuliia Oliinyk
PBPavlo Budanov
Pavlo Budanov
Examined variables affecting the reliability of informational signals, leading to distortion in the quantity of information regarding emergency indicators of technological parameters in power equipment. Suggested employing fractal-cluster theory to descr

1 April 2026
Verified
Book Chapter
Closed access
ACArtem Cherniuk
Artem Cherniuk
YOYuliia Oliinyk
Yuliia Oliinyk
PVPavlo Vasiuchenko
Pavlo Vasiuchenko
KBKostiantyn Brovko
Kostiantyn Brovko
TBTetiana Bondarenko
Tetiana Bondarenko

29 May 2026 in Bulletin of the National Technical University "KhPI". Series: Energy: Reliability and Energy Efficiency
Verified
Journal Article
Open access
YOYuliia Oliinyk
Yuliia Oliinyk
KBKostiantyn Brovko
Kostiantyn Brovko
ACArtem Cherniuk
Artem Cherniuk
PVPavlo Vasiuchenko
Pavlo Vasiuchenko
The intensive development of renewable energy in Ukraine and the world necessitates an in-depth study of the processes of integration of solar power plants into medium-voltage distribution networks. Increasing the share of decentralized generation sources changes the established modes of operation of electrical systems, makes it difficult to balance active and reactive power, affects the voltage level in nodes and creates additional requirements for protection and automation systems. The relevance of the problem is enhanced by the fact that networks of voltage class 6 – 10 kV were originally designed to work in the traditional direction of power flows – from the substation to consumers, while the connection of solar stations causes the appearance of reverse flows and uneven load distribution. The purpose of this study is to model the impact of photovoltaic plants on the operation of distribution networks and analyze the capabilities of inverters in increasing the efficiency of voltage regulation and maintaining the reliability of power supply. The object of the study is a 10/0.4 kV distribution network with a 5 MW integrated solar power plant, reproducing a typical example of a modern renewable source system. The main hypothesis is that the use of inverters with a reactive power control algorithm ensures the stability of operating modes and reduces the negative consequences of fluctuations in solar generation. The work adopts a comprehensive approach including analytical methods for calculating power flow distribution and computer simulations in the SICAD software environment. This made it possible to reproduce the operation of the network in various scenarios: at the night minimum load, the daytime peak of generation, as well as in transient modes. In addition, emergency situations were investigated, including a sudden shutdown of the solar power plant and the occurrence of short circuits. This approach makes it possible to assess not only the standard, but also the emergency conditions of the system's functioning. The scientific novelty of the work consists in the development of an approach to assessing the impact of photovoltaic power plants on the modes of operation of distribution electric networks, taking into account the possibilities of controlling the reactive power of inverters and the variable nature of solar generation. The practical significance of the results lies in the possibility of their use for the development of methodological recommendations for the integration of photovoltaic plants in medium voltage networks, as well as for the improvement of inverter control algorithms. The obtained conclusions can be useful both to operators of distribution systems and project organizations when planning the development of electrical networks, taking into account the growing share of renewable energy sources.