1 January 2019 in Construction and Building Materials
21 September 2019 in International Journal of Construction Education and Research
The Richard Review of the United Kingdoms (UK) Apprenticeships in 2012 proposed degree apprenticeships (DA) as a new model for the unification of academic and vocational learning. Apprenticeships have long been acknowledged as a practical vehicle to develop the vocational skills and educational achievements of the UK employee resource. The UK Government set a target of 3 million apprenticeship starts between 2015 and 2020. In order for higher education institutions (HEI) to participate in the new apprenticeship marketplace, they need to consider distinct factors that do not surface in traditional Bachelors programmes. Cognizant of these challenges this paper evaluates the development of the new degree apprenticeship programmes for built environment education through the research lens of HEI. This paper evaluates extant literature and primary data collected from qualitative interviews carried out across the UK HEI sector during 2017. Research findings are presented following analysis using NVivo. Narratives on the barriers, benefits, and opportunities, of degree apprenticeships, including academic quality assurance, governance, and pedagogic dimensions are presented. The findings include industry designed curriculum producing a different graduate output, redefining the purpose of HE, restructuring governance and resource, additional contractual obligations for stakeholders and the embedding of work-based learning strategies.
2 October 2024 in International Journal of Construction Education and Research
15 February 2019 in Journal of Civil Engineering and Construction
The research examined herein classifies initial and final set times, for samples of ternary mortars composed of CEM 1 (52.5) and Ground Granulated Blast Furnace Slag (GGBS). The samples tested comprised of different CEM 1 and GGBS proportions. The mixes used, ranged from 100% CEM1 where this component was replaced at 10% increments by mass terminating at a 20% CEM1 content. With a reduction in cement content, the balance of the total required binder was being made up with GGBS. The ternary mortar cubes were tested for initial and final set times at average ambient room temperature (19.7 – 22.2 °C) and temperatures of 5 and 40 degrees Celsius. The findings highlighted the additional time required for initial and final set times at reduced temperatures and it also highlighted the further additional time for initial and final set times when GGBS is used as a cement replacement in progressively increasing quantities. Initial and final set times at 40 degrees Celsius were faster than ambient and 5 degrees Celsius, however the difference between initial and final set times was much reduced at 40 degrees Celsius. Both temperature and cement replacement affected the compressive strength at a curing period of 28 days, however GGBS is known to take longer than CEM1 to achieve a given strength development of say 90% of the final or ultimate strength. The two factors of temperature and cement replacement have a significant impact on setting times.