28 September 2017 in Advances in Materials Science and Engineering
Steady increase in overexploitation of stone quarries, generation of construction and demolition waste, and costs of preparing extra landfill space have become environmental and waste management challenges in metropolises. In this paper, aggregate production is studied in two scenarios: scenario 1 representing the production of natural aggregates (NA) and scenario 2 representing the production of recycled aggregates (RA). This study consists of two parts. In the first part, the objective is the environmental assessment (energy consumption and CO2 emission) and economic (cost) evaluation of these two scenarios, which is pursued by life-cycle assessment (LCA) method. In the second part, the results of the first part are used to estimate the optimal combination of production of NA and RA and thereby find an optimal solution (scenario) for a more eco-friendly aggregate production. The defined formulas and relationship are used to develop a model. The results of model validation show that the optimal ratio, in optimal scenario, is 50%. The results show that, compared to scenario 1, optimal scenario improves the energy consumption, CO2 emissions, and production cost by, respectively, 30%, 36%, and 31%, which demonstrate the effectiveness of this optimization.
16 October 2024 in IEEE Open Journal of the Computer Society
Computer vision which uses Convolutional Neural Network (CNN) models is a robust and accurate tool for precise monitoring and pixel-level detection of potential damage in concrete structures. Using a state-of-the-art Dense ResU-Net model integrated with T-Max-Avg pooling layers, the present study introduces a novel and effective method for crack detection in concrete structures. The major innovation of this research is the introduction of the T-Max-Avg pooling layer within the Dense ResU-Net architecture which synergistically combines the strengths of both max and average pooling to improve feature retention and minimize information loss during crack detection. In addition, the incorporation of Residual and Dense blocks within the U-Net framework significantly enhances feature extraction and network depth, resulting in a more robust anomaly detection. The implementation of extensive data augmentation techniques improves the robustness of the model while the application of spatial dropout and L2 regularization techniques prevents overfitting. The proposed model showed a superior performance, outperforming traditional and state-of-the-art models. It had a Dice Coefficient score of 97.41%, an Intersection-over-Union (IoU) score of 98.63%, and an accuracy of 99.2% using a batch size of 32. These results confirmed the reliability and efficacy of the Dense ResU-Net with T-Max-Avg pooling layer for accurate crack detection, demonstrating its potential for real-world applications in structural health monitoring. By taking advantage of advanced deep learning techniques, the proposed method addressed the limitations of traditional crack detection techniques and offered significant improvements in robustness and accuracy.
28 March 2023 in The Baltic Journal of Road and Bridge Engineering
Bridge construction projects are rife with uncertainty because of their unique features, from execution of the work, time estimation, inspection and assessment to fund allocation. Therefore, a critical step is recognise and categorise the uncertainties associated in bridge building in order to meet project objectives in terms of quality, cost, schedule, environmental, safety, and technical indicators. Various models, however, have been created to detect and prioritise the uncertainty. One of the most commonly used approaches for dealing with uncertainty is the spherical fuzzy set. To formulate an issue, this technique uses a mathematical procedure. The analytic hierarchy process (AHP), on the other hand, is a computer technique that solves a complicated problem by breaking it down into numerous basic problems. A hybrid model based on spherical fuzzy sets and AHP (SAHP) can benefit from both approaches. This study proposes a SAHP based on group decision making (GSAHP) to prioritise the sources of uncertainty in bridge construction projects. Likewise, a modified algorithm is proposed for checking the consistency of the spherical fuzzy matrices. To show the model potential, a real case study is illustrated and evaluated. The model demonstrates its capabilities in modelling uncertainty under an environment with a number of unknown components. The findings reveal that the “delays” factor is of the highest, and the “project team conflicts” parameter is of the least importance. The research findings could be used by decision makers and managers to develop preventive measures.