HeA new machine will not fail easily in the early stage of its useful life. This phenomenon is consistent with the fact that the optimal sequential preventive maintenance (PM) policy which has longer PM intervals in its earlier stage of lifetime. In this paper, we propose a failure-rate-reduction periodic PM model with delayed initial time in a finite time span. Then, the optimal periodic PM policy is developed by minimizing the expected total maintenance cost, which can have smaller expected total maintenance cost than the optimal policy of the original failure-rate-reduction periodic PM model. The algorithm of finding the optimal PM policy for the proposed PM model is developed. Finally, examples are illustrated to verify the optimal policies of the proposed new PM model.
30 November 2008 in Expert Systems with Applications
Producing silicon wafers is a complex and important process for semiconductor manufacturers. Optimally utilizing each wafer to overcome the quartz shortage is tantamount to achieving maximum total profit. This makes the post-slicing inspection task a crucial step. This paper found that determining post-sliced wafer reuse is equal to measuring the maximum inscribed circle (MIC). This can be considered a nonlinear optimization problem. Due to silicon wafer flatness and fragility, we propose a machine vision-based inspection approach that uses a heuristic method to facilitate solving this MIC problem. The proposed method incorporates the Hooke-Jeeves pattern search with particle swarm optimization (PSO) to achieve fast convergence and quality solution. An experimental design was conducted to first verify the feasibility and identify the feasible control parameters for both PSO and the proposed HJ-PSO. Thirty defective wafers were then used to validate the proposed scheme. The experimental results reveal that the proposed scheme is effective and efficient for wafer post-slice inspection.