Te-Hsiu Sun

Te-Hsiu Sun

Auto-generated profile, based on publicly available information

Te-Hsiu Sun

Chaoyang University of Technology

Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 March 2014 in Journal of Intelligent Manufacturing
Verified
Journal Article
Closed access
PDF file
TSTe-Hsiu Sun
Te-Hsiu Sun
FTFang-Cheng Tien
Fang-Cheng Tien
RKRen-Jieh Kuo
Ren-Jieh Kuo

1 January 2014 in Quality Technology & Quantitative Management
Verified
Journal Article
Closed access
CCChun-Yuan Cheng
Chun-Yuan Cheng
XZXufeng Zhao
Xufeng Zhao
MCMingchih Chen
Mingchih Chen
TSTe-Hsiu Sun
Te-Hsiu Sun
HeA new machine will not fail easily in the early stage of its useful life. This phenomenon is consistent with the fact that the optimal sequential preventive maintenance (PM) policy which has longer PM intervals in its earlier stage of lifetime. In this paper, we propose a failure-rate-reduction periodic PM model with delayed initial time in a finite time span. Then, the optimal periodic PM policy is developed by minimizing the expected total maintenance cost, which can have smaller expected total maintenance cost than the optimal policy of the original failure-rate-reduction periodic PM model. The algorithm of finding the optimal PM policy for the proposed PM model is developed. Finally, examples are illustrated to verify the optimal policies of the proposed new PM model.

30 November 2008 in Expert Systems with Applications
Verified
Journal Article
Closed access
TSTe-Hsiu Sun
Te-Hsiu Sun
CLChi-Shuan Liu
Chi-Shuan Liu
FTFang-Chih Tien
Fang-Chih Tien

21 October 2010 in IEEE Transactions on Semiconductor Manufacturing
Verified
Journal Article
Closed access
TSTe-Hsiu Sun
Te-Hsiu Sun
CTChung-Hao Tang
Chung-Hao Tang
FTFang-Chih Tien
Fang-Chih Tien
Producing silicon wafers is a complex and important process for semiconductor manufacturers. Optimally utilizing each wafer to overcome the quartz shortage is tantamount to achieving maximum total profit. This makes the post-slicing inspection task a crucial step. This paper found that determining post-sliced wafer reuse is equal to measuring the maximum inscribed circle (MIC). This can be considered a nonlinear optimization problem. Due to silicon wafer flatness and fragility, we propose a machine vision-based inspection approach that uses a heuristic method to facilitate solving this MIC problem. The proposed method incorporates the Hooke-Jeeves pattern search with particle swarm optimization (PSO) to achieve fast convergence and quality solution. An experimental design was conducted to first verify the feasibility and identify the feasible control parameters for both PSO and the proposed HJ-PSO. Thirty defective wafers were then used to validate the proposed scheme. The experimental results reveal that the proposed scheme is effective and efficient for wafer post-slice inspection.