Xiao Tong

Xiao Tong

Auto-generated profile, based on publicly available information

Xiao Tong

School of Earth Science and Engineering, Hebei University of Engineering

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2021 in Engineering Failure Analysis
Verified
Journal Article
Closed access
RSRenliang Shan
Renliang Shan
ZLZhaolong Li
Zhaolong Li
CWChunhe Wang
Chunhe Wang
YWYonghui Wei
Yonghui Wei
Yao BaiYao Bai
Yao Bai
XTXiao Tong
Xiao Tong

1 October 2022 in AIP Advances
Verified
Journal Article
Open access
PDF file
RSRenliang Shan
Renliang Shan
XTXiao Tong
Xiao Tong
NLNan Liu
Nan Liu
YZYan Zhao
Yan Zhao
DLDong Liu
Dong Liu
ZLZhaolong Li
Zhaolong Li
The gradual development of coal mining in deep areas has brought new challenges to the surrounding rock support system. It is imperative to design surrounding rock support elements that exhibit strong tensile and shear resistance and are suitable for pretension load. In this paper, an anchor cable bolt with a c-shaped tube (ACC) is proposed, and in order to study the shear performance of the ACC, the mechanical properties of the ACC and ordinary cable bolts with various diameters and pretension loads are tested. In addition, a comparative analysis is performed to investigate the effect of diameter and pretension load on the shear strength of the ACC and cable bolts. The results show that compared with ordinary cable bolts, the ACC exhibits better shear resistance, where its ability to withstand transverse shear load and shear deformation increased by more than 26.8% and 7.0%, respectively. The diameter and pretension load of the bolt significantly affect its shear performance. The larger the diameter of the bolt, the greater the peak shear load. By increasing the pretension load, the shear load and shear displacement at the peak shear load decrease. The failure of the ACC and ordinary cable bolt is mainly due to a combination of shear and tensile failures. In addition, the action mechanism of the ACC is preliminarily explored, and it provides some references for clarifying the mechanical properties of the ACC.

30 January 2023 in Geofluids
Verified
Journal Article
Open access
PDF file
NLNan Liu
Nan Liu
XTXiao Tong
Xiao Tong
LCLongfei Chang
Longfei Chang
YLYong Lv
Yong Lv
The PBA construction method is suitable for urban subway construction in situations with dense traffic and many surrounding buildings and can effectively reduce surface disturbance and control surface subsidence. Based on field-measured data, this study creates numerical finite element models of 3D stratum-structure, studies the influence of each process conversion on the subsidence of the ground surface and the force of the station supporting structure during the construction of the PBA station, and clarifies the optimal construction parameters. The research results show that the consistency between the field monitoring data and the simulation data is more than 80%, which verifies the correctness of the model. It is concluded that the formation of the pile-beam-arch is the main part of the supporting structure and that digging the pilot tunnel and the formation of the beam arch are the control factors of surface settlement. Based on this, the best sequence of pilot tunnel excavation and arch buckle of the two-story two-span station is obtained, and the optimal pilot tunnel excavation scheme of first the middle and then the side, first the upper and then the lower, and the best arch buckle scheme of the synchronous arch buckle on both sides is determined. The results of the research can serve as a guideline when selection the construction parameters for similar PBA stations.

15 November 2024 in Mechanics of Advanced Materials and Structures
Verified
Journal Article
Closed access
NLNan Liu
Nan Liu
YJYusheng Jiang
Yusheng Jiang
XTXiao Tong
Xiao Tong
ZLZhaolong Li
Zhaolong Li
YZYan Zhao
Yan Zhao