31 August 2022 in Urban development and spatial planning
The stages of formation of digitalization strategies of participants in the investment and construction process and construction stakeholders are proposed, as well as a methodical approach to assessing the degree of digitalization at the macro, meso, and micro levels within the framework of investment and construction projects. It was found that digitalization led to the need to adapt the participants of the investment and construction process to new requirements, assess their own level of digital development, develop digitalization strategies that should be adapted to the requirements of participation in various investment and construction projects. Improving the mechanism of digital transformation of construction participants within the framework of investment and construction projects includes the creation of a system of indicators designed to evaluate and monitor the progress of digitalization and adaptation to project requirements, the development of measures for the development of digitalization, the definition of indicators and methods for evaluating the development of construction based on digital technologies. The basis of digitalization strategy formation is the use of indicators of digital development, which have different dimensions. Some are rated simply on a linguistic scale of "yes" or "no" or "adequate", "poor", "super high", "high", "low" or "average" development, others have corresponding numerical values. The company's self-assessment of its current level of digitalization is an integral stage of the formation of a competitive strategy, which is carried out in the form of target management and implemented in the form of interconnected stages. It is proposed to evaluate the list of measures to identify the existing state of digitization of construction participants, monitor their changes, and establish target indicators using expert evaluation methods. Prospects for further research are the creation of a complex economic and management toolkit to determine the level of digital development of participants in the process of digital transformation of construction and development of territories.
28 June 2024 in Spatial development
The article examines what imperatives and trends affect the marketing activity of construction participants and require its radical restructuring. A survey was conducted of thirty enterprises that are participants in investment construction projects (five enterprises are development companies, twelve are contractors, nine are design enterprises, and four are suppliers of construction materials), with the aim of identifying the main imperatives of their development and the introduction of innovative methods in operational and marketing activities. It was revealed that the main imperatives for the development of construction enterprises are the digitization of all business processes, orientation to environmental trends and the introduction of a flexible, adaptive system of interaction with consumers, as this provides an opportunity to promptly take into account their requirements and needs. It was found that all surveyed project stakeholders can and do use digital tools, social media platforms, and data analytics to refine their target audience, interact with diverse consumers, and increase awareness of environmental activities in the market. This underscores the need for investment and construction project participants to embrace global imperatives to transform marketing activities to remain competitive and relevant in a changing digital business environment. Consumers of construction products are the main stakeholders of investment and construction projects, who are really interested in obtaining housing of high quality, compliance with ecological standards and for the optimal price. Therefore, customer relationship management (CRM), implementing CRM systems to manage customer interactions, track leads, and improve communication throughout the project lifecycle is a must for building a successful developer marketing strategy. All surveyed businesses responded that, given the growing need for sustainability, they align their marketing activities with sustainability principles to meet consumer expectations.
11 November 2022 in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
The article explores the possibility of using conceptual approaches, methods and techniques and the very ideology of value-oriented management for the administration of investment and construction projects.Building Information Modeling (BIM) models are very useful when implementing cost-based construction management because they provide a data-rich environment that allows construction managers to make data-driven decisions about costs, materials and resources. This helps to optimize cost control and overall project management.The following advantages of value-oriented management in the implementation of construction projects have been identified, namely: increased cost efficiency, project cost management, risk reduction and the possibility of managing them, social and environmental effects, increased satisfaction of project participants and investors, obtaining additional competitive advantages of construction products, development innovations and introduction of new technologies, expansion of cooperation with stakeholders.Building Information Modeling (BIM) models can be useful when implementing cost-based construction management because they contain detailed information about the components and materials used in a construction project, provide a visual representation of the project, allow stakeholders to visualize the design and construction process, allow perform cost analysis at different stages of the project, allow for the identification of overlaps, conflicts or conflicts in the design, facilitate cost calculations when design decisions change, allowing project teams to explore alternative design and construction options, can be used to estimate the long-term costs of the life cycle of a building, including maintenance and operation costs.
29 January 2021 in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
The article considers the topical issue of thermal modernization of residential buildings and social facilities is an important area of research, but in the implementation of such projects there are many obstacles of organizational and administrative nature, which currently hinder the implementation of projects to improve energy efficiency of buildings and structures. and the systematization of which will allow to develop measures to eliminate existing barriers, and thus improve the attractiveness and accessibility of thermal modernization projects for the population and other stakeholders. The main stages of thermal modernization are systematized in accordance with the provisions of the current legislative and regulatory framework, the place of thermal modernization measures in the sequence of implementation of investment and construction projects is determined. It is determined that the main types of construction in which thermal modernization is carried out are capital repairs, reconstruction and technical re-equipment, but thermal modernization measures can be carried out during the current repair. Current repairs are not a type of construction, and therefore it is not subject to laws and regulations in the field of construction, and therefore the organization and implementation of such works from the standpoint of the requirements of legislation and regulations is the simplest. The following obstacles and barriers were identified during the development of the thermal modernization project, namely: the order of performance of the technical condition survey and energy audit is not legally established (in practice these are two unrelated actions, the result of which are not related technical reports analyzed by the designer. design), the stages of thermal modernization are not linked to a single methodology, given in separate documents, and therefore require special professional knowledge, not sufficiently reflected stages of preparation of thermal modernization at the stage of pre-design work, while at this stage decisions must be made , providing the required level of energy efficiency for the customer, technical and economic indicators of the project.