With the increase in the production of "green" energy in the world, that trend has also arrived in Serbia, so "WPP Crni vrh" is a high-capacity wind power plant where electricity will be produced and delivered to end consumers via the planned transmission lines, which will increase the reliability and security in suppling electricity to consumers in the territory of the municipalities of Žagubica and Majdanpek and the city of Bor. When designing a wind power plant, it is very important to determine the geomechanical structure of the terrain, which determines the method of foundation (shallow or deep) of the wind turbine. Due to the high height of the column (125 m), the effect of wind is the dominant load on wind turbines. Due to its stochastic nature, as well as due to the frequent absence of a primary direction of action, the foundation rates are intended to be circular for the largest number of wind turbine positions. In addition, the circular shape is significantly more practical from the point of view of execution, and generally superior from the aspect of behavior (performance). In two locations, due to the combination of the relatively unfavorable position of the wind turbine in relation to the slope of the slope, the stratigraphy of the terrain and the geotechnical characteristics of the lithological layers represented, the solution of deep foundations on "standing" piles was adopted. The paper shows the way of presenting the results of geological, geomorphological, engineering geological and geomechanical laboratory tests, using the example of the selected location of the TI-12 wind turbine within the "wind power plant "Crni vrh.
Most surface coal mines have excavated the most favoruable coal reserves through decades of production. Current coal production is taking place in very complex mining-geological conditions. The mines are getting deeper, there is a lot of dewatering and spalling of the coal. As the proximity of large and numerous smaller and larger river flows, high population density and developed infrastructure is evident, then it can be understood what kind of problems planners and mining operatives are facing. Special attention was given to solving the instability of internal landfills, which are often the main cause of failure to realize the planned dynamics of coal production. The paper is precisely related to the recognition of one of the possible solutions that can make a reliable contribution to solving these problems.
The use of ash, slag and waste gypsum resulting from the flue gas desulfurization process as a combustion by-product from thermal power plants is becoming increasingly relevant in the context of sustainable waste management and reducing negative environmental impacts. The use of ash, slag and waste gypsum resulting from the flue gas desulfurization process as a combustion by-product from thermal power plants is becoming increasingly relevant in the context of sustainable waste management and reducing negative environmental impacts. In order to mitigate negative effects and improve efficiency in the construction industry and other sectors, these materials can be used in various ways. Using these products reduces the amount of waste, while at the same time reducing the need for the use of natural resources. This contributes to sustainable development, although it is necessary to carefully determine the quality of combustion by-products from thermal power plants due to the possible negative impact on the long-term stability of buildings. The fact that depositing these materials requires not only space but also significant financial resources is very important. Above all, the use of fly ash, slag and spent gypsum in the construction industry can contribute to the reduction of carbon dioxide emissions (CO2).
The exploration of mineral resources is carried out according to the current legislation, on the basis of which the potential of the area is determined. It is carried out using geological, hydrogeological methods, engineering - geological research, using surface and underground research works and other tests. Research, exploitation and primary processing of mineral raw materials takes place in a certain period of time and under the influence of very different influences. In modern conditions, mines are subject to purchase and sale, and deposits of mineral raw materials are subject to concessions, so their value is determined by the amount of profit, which is obtained by exploitation in a certain period of time. In this context, geological research represents one of the very important input parameters for the process of exploitation of mineral raw materials.
Optimization of field geological, geotechnical exploration and laboratory tests in order to design solar power plants in areas larger than 10 ha and in anthropogenic environments (mine waste dumps or flotation waste dumps) is imposed as a primary goal for researchers, explorers and designers. How to cover with the required number of exploration and laboratory works, the exploration area for the construction of a solar power plant, which is in most cases heterogeneous, in terms of lithological composition, physical and mechanical properties and chemical characteristics? In these cases, geotechnical studies are very complex, with a multidisciplinary approach to the analysis of the subject site for construction, in compliance with the current legislation, regulations, norms and standards. In order to optimize the designed methods in exploration areas intended for the construction of photovoltaic plants, and bearing in mind the fact that thermal conductivity depends on the type of soil, humidity and temperature, the obtained results of geophysical tests were correlated with the results of chemical analyses performed on soil samples from exploration boreholes (pH and SO4 2 -) performed at mining waste dumps. The paper presents correlative analyses of the results of geophysical tests and chemical analyses from 5 locations of mine waste dumps in the vicinity of Bor and Majdanpek, which are intended for construction of solar power plants.
Activities in the exploitation of mineral raw materials are of economic importance and serve the needs of social development, while having a significant impact on the environment. Open pit mining represents an extreme case of environmental degradation, with the removal of vegetation cover and significant change in relief. Open-pit mining operations can intensively modify pre-existing ecosystems, altering soil characteristics, landscapes and landscape integrity, destroying natural habitats, interrupting natural species dynamics and genetic flow. The multifunctional role of the exploitation field does not only apply to the period during the mine, but also after its closure. It is reflected in the use and repurposing of land for agriculture, forestry, construction of industrial zones, installation of solar panels on landfills, transformation of space into lakes, nature parks, all with the aim of preserving the biodiversity of the devastated area. The advantages of this approach contribute to the reduction of social tensions, ecological rehabilitation and economic profitability. The implementation of this concept requires strict legal regulations that require planned reclamation, large initial investments in soil stabilization, pollution remediation, and the alignment of interests between mining companies, local authorities, and environmental associations.