Myoung-Ju Park

Myoung-Ju Park

Auto-generated profile, based on publicly available information

Myoung-Ju Park

Department of Industrial Engineering, Seoul National University, Seoul, Korea

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 April 2022 in International Journal of Production Economics
Verified
Journal Article
Closed access
MPMyoung-Ju Park
Myoung-Ju Park
AHAndy Ham
Andy Ham

1 April 2015 in Transportation
Verified
Journal Article
Closed access
PDF file
SHSung-Pil Hong
Sung-Pil Hong
YMYun-Hong Min
Yun-Hong Min
MPMyoung-Ju Park
Myoung-Ju Park
KKKyung Min Kim
Kyung Min Kim
SOSuk Mun Oh
Suk Mun Oh

1 February 2011 in Transportation Research Part B: Methodological
Verified
Journal Article
Closed access
YMYun-Hong Min
Yun-Hong Min
MPMyoung-Ju Park
Myoung-Ju Park
SHSung-Pil Hong
Sung-Pil Hong
SHSoon-Heum Hong
Soon-Heum Hong

30 June 2021 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
AHAndy Ham
Andy Ham
MPMyoung‐Ju Park
Myoung‐Ju Park
KKKyung Min Kim
Kyung Min Kim
Compromising productivity in exchange for energy saving does not appeal to highly capitalized manufacturing industries. However, we might be able to maintain the same productivity while significantly reducing energy consumption. This paper addresses a flexible job shop scheduling problem with a shutdown (on/off) strategy aiming to minimize makespan and total energy consumption. First, an alternative mixed integer linear programming model is proposed. Second, a novel constraint programming is proposed. Third, practical operational scenarios are compared. Finally, we provide benchmarking instances, CPLEX codes, and genetic algorithm codes, in order to promote related research, thus expediting the adoption of energy-efficient scheduling in manufacturing facilities. The computational study demonstrates that (1) the proposed models significantly outperform other benchmark models and (2) we can maintain maximum productivity while significantly reducing energy consumption by 14.85% (w/o shutdown) and 15.23% (w/shutdown) on average.

29 April 2009 in Cornell Hospitality Quarterly
Verified
Journal Article
Closed access
KCKyuwan Choi
Kyuwan Choi
JHJohye Hwang
Johye Hwang
MPMyoungju Park
Myoungju Park
In labor scheduling, restaurant managers face dual challenges: overstaffing that means excessive labor costs and understaffing that invites the opportunity cost of service errors and lost business. Most operators seek to rely on their personal experience and judgment to determine schedules that are meant to maintain service quality and limit labor costs, but an analysis of one Korean restaurant finds that this goal is elusive. The labor scheduling model based on integer programming (IP) is presented to address the staffing and scheduling issues and service standards by maintaining an appropriate ratio of part-time to full-time employees. Using appropriate constraints, the model was used to generate a schedule for a table service restaurant in Seoul, South Korea, that is affiliated with a global chain. When compared to the existing schedule, the IP-generated schedule helped the restaurant reduce overall labor costs while ensuring appropriate service levels.

1 March 2009 in European Journal of Operational Research
Verified
Journal Article
Closed access
SHSung-Pil Hong
Sung-Pil Hong
SCSung-Jin Cho
Sung-Jin Cho
MPMyoung-Ju Park
Myoung-Ju Park