Carsten Kamp

Carsten Kamp

Auto-generated profile, based on publicly available information

Carsten Kamp


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 October 2025 in Journal of Building Engineering
Verified
Journal Article
Closed access
CHChristoph Heuer
Christoph Heuer
VJVictoria Jung
Victoria Jung
CKCarsten Kamp
Carsten Kamp
SBSigrid Brell-Cokcan
Sigrid Brell-Cokcan

8 June 2026
Verified
Book Chapter
Open access
LKLukas Kirner
Lukas Kirner
MZMarit Zöcklein
Marit Zöcklein
JOJyrki Oraskari
Jyrki Oraskari
CKCarsten Kamp
Carsten Kamp
FCFabian Claßen
Fabian Claßen
SBSigrid Brell-Cokcan
Sigrid Brell-Cokcan
The construction sector has slow adaptation to emerging technologies and lagging productivity compared to other industries. Level of construction robot autonomy is impacted by complexity and variability of a conventional construction site environment. One approach to increasing robot autonomy is to integrate more environmental sensors. However, when faced with the reality of complex tooling and sensing systems used on a construction site, including rented equipment that frequently moves between sites, integration of multiple changing sensor data streams becomes a bottleneck for smooth operation. Machines that host sensory systems often become data silos that do not communicate across systems. To address this, we explore how to enable the sharing of sensor observations between actors on a construction site using loosely coupled communication and event processing between sensors and construction site machines. We present an exemplary system architecture and assess its performance.