Bratislav Ilić

Bratislav Ilić

Auto-generated profile, based on publicly available information

Bratislav Ilić

Faculty of Architecture, University of Belgrade, Bul. Kralja Aleksandra 73/II, 11000 Belgrade, Serbia

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 August 2026 in Preprints.org
Verified
Preprint
Open access
PDF file
DPDarko Pavićević
Darko Pavićević
DVDejan Vasovic
Dejan Vasovic
JTJefto Terzovic
Jefto Terzovic
BIBratislav Ilić
Bratislav Ilić
NSNeda Sokolovic
Neda Sokolovic
NŠNenad Šekularac
Nenad Šekularac
Fashion and textile industry generate substantial volume of waste, during the production phase, as well as in the consumer phase. Textile waste is disposed in the landfills or incinerated, significantly affecting the environment. At the same time, construction industry faces demand to consider different approaches to the conventional formwork systems, which are resource intensive and disposed after the use. Feasibility of the usage of the cut-off knitted textile waste bonded with polymer-cement binder to create the composite formwork for casting concrete and mortar elements is presented in this paper. Experiments are designed with different types of cement-based mixtures to make the textile formwork composite and the polymer-cement mixture. Experimental research tested the bond between two pieces of textile bound by the selected polymer-cement binder and a proposal was given for determining the required overlap length. Obtained testing results for adequate and optimal samples, showed that the recycled textile waste may be used as efficient and low-cost alternative to traditional formwork, while providing flexible and non-prismatic geometrical shapes of the products and reducing the environmental impact.

1 January 2024 in Spatium
Verified
Journal Article
Open access
PDF file
BIBratislav Ilic
Bratislav Ilic
In the wake of accelerated development in the vicinity of the Belgrade Fair and further plans for construction in this part of the city, the events that have unfolded during the past decade of Belgrade?s urban development have situated Belgrade Fair as a key topic in the spotlight of the Serbian urban planning community. The objective of this paper is, first and foremost, the formulation of a methodologically broader critical matrix regarding the formation of an approach to the future adoption of strategies for the urban renewal of the Belgrade Fair (Sajam) complex. This complex, in addition to basic research on its architectural and urban qualities, also includes numerous current and temporal aspects from which it is possible to draw conclusions about the issue at hand. These analyses of the architectural and urban value of the fair complex observe the key themes and concepts that define the Sajam?s spatial and developmental paradigm. They also accentuate current questions regarding the defragmentation of the heritage of modern architecture in architectural practice. Also highlighted, in addition to the architectural and urban planning composition of the first construction phase between 1953 and 1957, are the today less-known architectural and engineering aspects of the exhibition halls that lack heritage status, along with an exploration of the renewal or transformation of this space through an analysis of recent conceptual design proposals. This study, through synthesis, seeks to establish a comprehensive picture and the broader critical framework needed to pass judgement before the ideological and constructive breakdown of Belgrade?s exhibition complex as a paradigm of Yugoslav purism. The conclusions leave space for the appreciation of different approaches, opening up new questions that clearly require social consensus and which have not yet been answered in the public or professional space.

1 January 2026
Verified
Conference Paper
Closed access
DVDejan Vasovic
Dejan Vasovic
RORuža Okrajnov-Bajić
Ruža Okrajnov-Bajić
JTJefto Terzović
Jefto Terzović
BIBratislav Ilić
Bratislav Ilić
DPDarko Pavićević
Darko Pavićević
This paper presents the assessment and reconstruction methods developed and adapted for the strengthening of the reinforced concrete office building structure in Libreville, Republic of Gabon. The office building reinforced concrete frame structure consists of a ground floor and eight upper floors (G+8). Upon completion of the construction, immediately prior to occupancy and during the furnishing phase, cracks appeared in the load-bearing elements of the structure – specifically in the beams and columns. Fearing catastrophic consequences and potential structural collapse, the client’s consultants recommended the total demolition of the building. However, the client opted for a structural expert assessment before making a final decision. The assessment revealed that the building was originally designed as a G+3 structure. During construction, the height was increased to G+8 without any documented changes of the original structural design. Structural assessment and analyses confirmed that the existing reinforced concrete structure could not support the increased load, but concluded that it was possible to strengthen the columns and beams to accommodate double increase of load. To verify the load-bearing capacity of the existing piles resting directly on bedrock, testing was conducted on soil samples, and the necessary reinforcements for the foundation structure were determined. Based on the conducted testing and the provided expert assessment, a reconstruction project was developed and successfully realized. The building was successfully rehabilitated and adapted for the designed use and occupancy.

11 September 2026 in Buildings
Verified
Journal Article
Open access
PDF file
DPDarko Pavićević
Darko Pavićević
DVDejan Vasovic
Dejan Vasovic
JTJefto Terzovic
Jefto Terzovic
BIBratislav Ilić
Bratislav Ilić
NSNeda Sokolovic
Neda Sokolovic
NŠNenad Šekularac
Nenad Šekularac
This paper presents an experimental study on the behavior of the bond between cotton knitted textile cut-offs and a polymer–cement binder. The first part of the research examined the influence of polymer–cement coating on the maximum tensile load of this type of textile. For this purpose, the maximum tensile force of plain textiles and polymer–cement-coated textiles, with one and two layers of textiles, was tested. The results showed that polymer–cement coating increases the maximum tensile force by an average of 36%, and double polymer–cement coating by an average of 79% compared to twice the maximum force of the textile itself. The second part of the research examined the influence of the overlap length of independent textile parts on the transfer of tensile force from one part to another. Three overlap lengths were tested: 25 mm, 38 mm and 50 mm. The results indicate the conclusion that it is possible to make a continuous polymer–cement–textile surface from knitted textile parts, and suggest that for this type of textile, an overlap length greater than 25 mm is sufficient to transfer the same order of magnitude of maximum tensile forces as for continuous textiles. Additional research is needed to more precisely determine the sufficient overlap length. This research confirmed the hypothesis that cotton knitted textile waste cut-offs could be effectively bonded with a polymer–cement binder to enable the transfer of tensile forces and used as a material for the manufacture of textile formwork.