Yevhen Stavychnyi

Yevhen Stavychnyi

Auto-generated profile, based on publicly available information

Yevhen Stavychnyi

Public Join Stock Company Ukrnafta, Ukraine

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 April 2023 in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
Verified
Journal Article
Closed access
YKYevhenii Koroviaka
Yevhenii Koroviaka
MMM. R Mekshun
M. R Mekshun
AIA. O Ihnatov
A. O Ihnatov
BRBoranbay Ratov
Boranbay Ratov
YTYa. S Tkachenko
Ya. S Tkachenko
YSYe. M Stavychnyi
Ye. M Stavychnyi
Purpose. To rationalize well washing by considering the influence of the annular channel limitation, granulometric composition of the mud, limitation of the joint movement of mud particles, drill string rotation, shape of the movement channel, and rheological properties of a cleaning agent. Methodology. Applied laboratory studies on the properties of drilling fluids are carried out using modern methods of analytical analysis and experimental studies, in particular, by using general principles of mathematical and physical modelling, methods of processing the results of studies in the EXCEL, MATNSAD environment, control and measuring devices of the laboratory of washing liquids of the Department of Oil-and-Gas Engineering and Drilling of Dnipro University of Technology (hydrometer, viscometer, plastometer, stalagmometer), and materials (technical water, clay bentonite powder, reagents, stabilizers and activators, surfactants as well as equipment and laboratory base of “Ukrnafta” PJSC to carry out certain stages of research. Findings. The properties of surface-active substances and activated washing liquids are analyzed. The main technological properties of drilling fluids are studied. Comprehensive information on the physical and chemical ability of flushing drilling fluids is provided. The main technological measures ensuring the stability of drilling process using activated-surfactant drilling fluids are considered in detail. The main technological principles of determining rational formulations of a selected cleaning agent in the circulation of Newtonian liquids are formulated and substantiated. A detailed description of surfactants, their properties and methods to study the formed solutions is given. Originality. The process of a rock-breaking tool on the well bottom will be stable in the conditions of dynamic equilibrium of the rock-breaking processes and removal of broken products into the annular space. Therefore, for a correct understanding of wellbore washing issues, basic regularities are established of the specified processes and the influence of various factors on these processes. Practical value. It has been proven that in order to give a drilling fluid the necessary properties that, on the one hand, will ensure an increase in the efficiency of rock breaking on the well bottom, and, on the other hand, will create favourable conditions for stable removal of cuttings onto the surface and maintenance of the well walls in a stable condition, it is necessary to apply different methods, in particular chemical activation as well as magnetic, thermal and electrochemical activation, in its different varieties.

30 September 2024 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
OVOleg Vytyaz
Oleg Vytyaz
OCOksana Chernova
Oksana Chernova
YSYevhen Stavychnyi
Yevhen Stavychnyi
RMRostyslav Martyniuk
Rostyslav Martyniuk
JZJan Ziaja
Jan Ziaja
Purpose. Development of effective composite plugging systems for reliable fastening of oil and gas wells in difficult mining-geological conditions of deposits of Ukraine. Methods. The proposed research is based on an analytical and industrial study of the problems of the well construction and fastening in the conditions of chemogenic deposit occurrence when applying the analysis of geophysical research materials. The research of tamponage solutions and buffer liquids was carried out using standard devices and methods that meet the set of requirements for testing cements and technological systems for well construction. Processing of research results was carried out in MATHSAD and EXCEL. Composite cement CEM V according to the European standard EN 197-1, tamponage cement 1-G, krents - high-basic C2F CaSO4 and low-basic 3(CF) CaSO4 calcium sulfoferites were used for the research. Findings. It was established that the basic plugging material, as well as technological solutions for fastening wells in difficult mining-geological conditions, do not ensure compliance of the well as an engineering structure with operational reliability indicators. As a result, violations in the fastening system are quite often recorded, which require significant time and financial costs for their elimination, and sometimes lead to well liquidation. In order to increase the reliability of fastening wells, it is necessary to use multi-component tamponade systems modified by krents. Calcium sulfoferrite admixtures have been proved to accelerate the kinetics of early strength and contribute to the formation of cement stone with improved characteristics. The need to use effective buffer systems to improve the quality of fastening is substantiated. Originality. On the basis of assessment, systematization and detailed study of geophysical material and features of well fastening under the conditions of exposure to chemogenic sediments, the necessity of using composite plugging material was established. The conducted studies have proved that to ensure reliable fastening of wells in difficult mining-geological conditions, it is necessary to use multicomponent composite plugging material modified by calcium sulfoferites with accelerated kinetics of early strength, which form cement stone with a densely packed structure. Practical implications. Based on the industrial material evaluation and detailed laboratory studies, technological solutions have been developed to increase the reliability of well fastening due to the introduction of multi-component composite plugging material modified by krents and buffer liquids.

1 January 2022
Verified
Conference Paper
Closed access
IVI. Vytvytskyi
I. Vytvytskyi
OMO. Martsynkiv
O. Martsynkiv
IKI. Kovbasiuk
I. Kovbasiuk
MSM. Seniushkovych
M. Seniushkovych
YSY. Stavychnyi
Y. Stavychnyi
YZY. Zhdanov
Y. Zhdanov

30 June 2024 in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
Verified
Journal Article
Closed access
YKYevhenii Koroviaka
Yevhenii Koroviaka
YSYe. M Stavychnyi
Ye. M Stavychnyi
OMO. B Martsynkiv
O. B Martsynkiv
AIA. O Ihnatov
A. O Ihnatov
AYA. V Yavorskyi
A. V Yavorskyi
Purpose. On the base of the geological cross-section analysis of the productive stratum and the features of the filtration-capacitance characteristics of the reservoir rocks, to develop effective technological fastening schemes for the delimitation of closely located different-pressure and different-saturated horizons on the example of the Romny group deposits. Methodology. The proposed work is an analytical and production research on the geological-and-lithological structure features of borehole sections of the Romny structure and the results of their drilling and cementing based on the analysis of electrical, pulsed neutron-neutron, acoustic and other types of loggings. The data on the spectrum of the oil and gas boreholes properties cores was obtained on the basis of macroscopic description, methodical and practical methods of lithological, sedimentological, and facies analysis. The filtration capacity of permeable reservoir rocks was examined with the application of the Darcy’s device. Modern methods of experimental research analysis using mathematical and physical modeling techniques, methods for processing research results in SolidWorks, STATGRAPHICS, MATHSAD, EXCEL, control and measuring devices were applied. Findings. It has been established that currently applied fastening methods do not provide the prerequisites for high-quality delineation of productive horizons, as a result of which interlayer flows occur, that is lead to the loss of the potential flow rate of the boreholes and increasing in the cost of hydrocarbon production. A new design of the borehole is proposed in order to increase the reliability of the fastening. It has been proven that the effectiveness of opening oil-saturated reservoirs increases with the application of specialized drilling flushing fluids capable of minimizing the risk of their clogging. The necessity of cementing the production column and the shank with tamponage materials based on composite cements is substantiated, while effective buffer systems should be applied to separate process fluids. Originality. On the base of the systematization and correlation of the geophysical material, the specific features of the structure of the productive strata of B-18 and B-19 horizons were evaluated as well as the nature and degree of saturation, the filtration-capacity characteristics of the seams. It has been proven that in order to reliably cover the high-pressure water-bearing horizon B-18 with an operational column, it is recommended to include packer systems of various types of activation in the equipment. Practical value. On the basis of the detailed multifaceted results of laboratory and industrial testing and analytical model research, technological solutions have been developed for boreholes fastening in the conditions of the occurrence of closely located productive horizons of different pressures and different saturations on the example of the Romny group deposits.

30 April 2025 in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
Verified
Journal Article
Closed access
YSYe. M Stavychnyi
Ye. M Stavychnyi
YKYevhenii Koroviaka
Yevhenii Koroviaka
AIA. O Ihnatov
A. O Ihnatov
MTM. O Tokareva
M. O Tokareva
VYV. V Yavorska
V. V Yavorska
Dariusz SALADariusz SALA
Dariusz SALA
Purpose. Comprehensive study of geological and technological factors of drilling, flushing during drilling, stabilization of wellbore walls, as well as opening of productive horizons in difficult mining and technical development conditions at different stages of hydrocarbon deposits. Methodology. When carrying out the research, basic methods of mathematical and physical modeling, bench experimentation, as well as methods for processing the results of laboratory and industrial research in the EXCEL and MATNCAD environment were used. Measurements of the parameters of compositions of special process liquids were carried out using appropriate control and measuring equipment and materials. Findings. Laboratory and production data on the analysis of well bottom deepening indicators and the use of special agents in wells ‒ flushing fluids, cementing systems in tandem with buffer fluids are proposed for consideration. These agents make it possible to rationalize the drilling process, as well as prevent the active development of deterioration in the filtration properties of reservoir rocks and create a reliable transport channel for hydrocarbons. Originality. Based on the study of the results of research into well construction processes, the following important circumstance has been proven. The solution to the problem of improving the quality of field development, in this case hydrocarbon fields, lies in the use of integrated approaches to the organization of downhole circulation processes of special technological fluids. Practical value. The obtained comprehensive results of laboratory and industrial research can be taken as the basis for creating modern methods for designing processes for deepening the face, as well as flushing when drilling and casing wells, the construction of which is carried out in sedimentary rocks.

25 June 2025 in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
Verified
Journal Article
Closed access
AIA. O Ihnatov
A. O Ihnatov
ОAО. О Aziukovskyi
О. О Aziukovskyi
YSY. M Stavychnyi
Y. M Stavychnyi
SRS. A Rybachuk
S. A Rybachuk
IAI. K Askerov
I. K Askerov
Dariusz SALADariusz SALA
Dariusz SALA
Purpose. Setting the parameters of drilling, flushing and cementing cycles of wells constructed in sedimentary rocks that are subject to integrity violations, absorption of drilling fluid and stuck drill pipes, as well as the development, based on these parameters, of effective methods for eliminating well complications. Methodology. The geological structure of the deposits was studied taking into account geophysical and well studies. Conclusions regarding the complexity of the geological conditions in the well are based on statistical information. The technical and technological parameters of the devices for eliminating complications and cleaning the well were studied on a stand equipped with a ZIF-650M drilling rig, NB-4 and NB-32 pumps, pressure gauges, a flow meter, a tachometer, and a coordinate controller. Studies of the properties of washing liquids were carried out on the basis of standardized methods and instruments. Mathematical and physical modeling was used with results processed in MATHCAD and EXCEL. Findings. The process of well construction was studied using the example of fields in the Dnipro-Donetsk depression. It has been proven that high quality of drilling, flushing and casing works will allow for efficient hydrocarbon production. Issues of technical and technological support for the elimination of stuck wells are considered. The features of bottomhole and wellbore flushing with a closed circulation system for drilling fluids have been studied. The characteristics of the processes of preparing a well for casing are given and regulations for carrying out work on cleaning complicated sections of the wellbore are proposed. Originality. Based on the data on the peculiarities of well construction in the Dnipro-Donetsk Basin, it has been proven that a rational scheme for field development is based on the need to implement comprehensive programs for the construction of wells that exclude the occurrence of geological and technical complications. Practical value. The results presented can serve as the basis for progressive methods for constructing wells that are located in clayey strata prone to the occurrence of sticking and cavities.