Xiaoyong Kou

Xiaoyong Kou

Auto-generated profile, based on publicly available information

Xiaoyong Kou

Shanghai Tunnel Engineering Co., Ltd., Shanghai 200032, China

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 March 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
ZDZeyu Dai
Zeyu Dai
PLPeinan Li
Peinan Li
XWXi Wang
Xi Wang
JLJun Liu
Jun Liu
JFJie Fan
Jie Fan
XKXiaoyong Kou
Xiaoyong Kou
This article outlines the merits of the proposed synchronous propulsion and assembly method in the construction of a long-distance tunnel. In traditional shield construction, the stress of the unlooped segment during the assembly process is systematically overlooked. However, in the novel tunnel construction method, the advancing force of the shield directly acts on the unlooped segment, so the safety of the unlooped segment is unknown. In this paper, focusing on the safety of the segment assembly process, the segment interactions and stress concentrations under asymmetric force effects are analysed in detail via a suite of finite element models. The results show that in the synchronous propulsion and assembly mode the segments will rotate inward. A clamping effect will gradually appear during the assembly process, which makes segment deflection decrease and the stress distribution more uniform. Under asymmetrical stress, the damage to longitudinal segments is highly correlated with the types of assembly errors. The damage position that is deflected radially inward will change with the deflection angle, and the outer joint of the segment is the largest. Based on the numerical outputs, guidelines for the application of synchronous propulsion and assembly technology in practical engineering are provided.

29 October 2026 in Buildings
Verified
Journal Article
Open access
PDF file
ZZZihan Zeng
Zihan Zeng
JZJunyi Zhang
Junyi Zhang
FPFanghui Pan
Fanghui Pan
JLJun Liu
Jun Liu
HHHaolin Huan
Haolin Huan
CWChanghong Wang
Changhong Wang
Synchronous Thrust and Assembly Technology (STAT), which enables simultaneous shield propulsion and segment erection, can improve tunneling efficiency and reduce construction duration compared with conventional shield tunneling. However, during STAT construction, thrust from shield tail jacks directly acts on incomplete segmental lining rings before ring closure. Differential jack strokes caused by shield attitude fluctuations and segment assembly errors may therefore induce localized asymmetric stress distributions, resulting in segment deflection, joint misalignment, and potential structural damage. To evaluate these risks, this study develops a case-based methodological framework for assessing the mechanical safety of incomplete segmental lining rings and bolts under asymmetric loading conditions, using the Shanghai Rail Transit Airport Link Line tunnel as the engineering case. A refined finite element model was established to analyze the critical deflection behavior of incomplete segmental lining rings subjected to jack thrust during assembly. Field tests were conducted to monitor bolt mechanical responses under STAT conditions and to provide engineering validation for the numerical results. In addition, the critical differential jack stroke was determined based on the shield machine’s maximum design turning radius and shield tail clearance. Within the modeled one- to three-segment assembly stages, the inter-segment restraint progressively increased, reducing segment deformation and bolt loads. No saturation of the clamping effect beyond the third segment was claimed. The simulated maximum segment deflection angle corresponds to a differential jack stroke below the shield kinematic limit of 21.9 cm. To maintain the mechanical safety of incomplete segmental lining rings within the investigated project conditions, the segment deflection angle should be controlled below the minimum damage initiation angle of 0.4°. The numerical model evaluated bolt responses during the single-segment stage; however, field measurements were available only after the second segment installation and therefore did not directly validate the most unfavorable single-segment stage. By integrating segment damage thresholds, bolt stress responses, shield tail clearance, and jack stroke constraints, project-specific attitude deviation control criteria were proposed for the investigated large-bore shield-driven tunnel. It should be noted that these criteria were derived from a specific finite element model and limited field measurements from one engineering case; therefore, recalibration and further validation are required before applying the proposed thresholds to shield tunnels with different diameters, segment geometries, geological conditions, or shield machine configurations.