Joseph Cheuk Yi Lee

Joseph Cheuk Yi Lee

Auto-generated profile, based on publicly available information

Joseph Cheuk Yi Lee

Department of Atmospheric and Oceanic Sciences, University of Colorado, UCB 311, Boulder, CO 80309, USA

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
23 November 2017 in Geoscientific Model Development
Verified
Journal Article
Open access
PDF file
JLJoseph C. Y. Lee
Joseph C. Y. Lee
JLJULIE LUNDQUIST
JULIE LUNDQUIST
Forecasts of wind-power production are necessary to facilitate the integration of wind energy into power grids, and these forecasts should incorporate the impact of wind-turbine wakes. This paper focuses on a case study of four diurnal cycles with significant power production, and assesses the skill of the wind farm parameterization (WFP) distributed with the Weather Research and Forecasting (WRF) model version 3.8.1, as well as its sensitivity to model configuration. After validating the simulated ambient flow with observations, we quantify the value of the WFP as it accounts for wake impacts on power production of downwind turbines. We also illustrate with statistical significance that a vertical grid with approximately 12 m vertical resolution is necessary for reproducing the observed power production. Further, the WFP overestimates wake effects and hence underestimates downwind power production during high wind speed, highly stable, and low turbulence conditions. We also find the WFP performance is independent of the number of wind turbines per model grid cell and the upwind–downwind position of turbines. Rather, the ability of the WFP to predict power production is most dependent on the skill of the WRF model in simulating the ambient wind speed.

25 May 2017 in Boundary-Layer Meteorology
Verified
Journal Article
Open access
PDF file
JLJoseph C. Y. Lee
Joseph C. Y. Lee
JLJULIE LUNDQUIST
JULIE LUNDQUIST
Wind-turbine-wake evolution during the evening transition introduces variability to wind-farm power production at a time of day typically characterized by high electricity demand. During the evening transition, the atmosphere evolves from an unstable to a stable regime, and vertical stratification of the wind profile develops as the residual planetary boundary layer decouples from the surface layer. The evolution of wind-turbine wakes during the evening transition is examined from two perspectives: wake observations from single turbines, and simulations of multiple turbine wakes using the mesoscale Weather Research and Forecasting (WRF) model. Throughout the evening transition, the wake’s wind-speed deficit and turbulence enhancement are confined within the rotor layer when the atmospheric stability changes from unstable to stable. The height variations of maximum upwind-downwind differences of wind speed and turbulence intensity gradually decrease during the evening transition. After verifying the WRF-model-simulated upwind wind speed, wind direction and turbulent kinetic energy profiles with observations, the wind-farm-scale wake evolution during the evening transition is investigated using the WRF-model wind-farm parametrization scheme. As the evening progresses, due to the presence of the wind farm, the modelled hub-height wind-speed deficit monotonically increases, the relative turbulence enhancement at hub height grows by 50%, and the downwind surface sensible heat flux increases, reducing surface cooling. Overall, the intensifying wakes from upwind turbines respond to the evolving atmospheric boundary layer during the evening transition, and undermine the power production of downwind turbines in the evening.

26 February 2021 in Journal of Open Source Software
Verified
Journal Article
Open access
PDF file
JPJordan Perr-Sauer
Jordan Perr-Sauer
MOMike Optis
Mike Optis
JFJason M. Fields
Jason M. Fields
NBNicola Bodini
Nicola Bodini
JLJoseph C.Y. Lee
Joseph C.Y. Lee
JMJohn Meissner
John Meissner

1 September 2015 in Surface and Coatings Technology
Verified
Journal Article
Closed access
JLJoseph Lee
Joseph Lee
KHKuo-Hua Huang
Kuo-Hua Huang
KHKai-Chieh Hsu
Kai-Chieh Hsu
HTHuan-Chien Tung
Huan-Chien Tung
JLJyh-Wei Lee
Jyh-Wei Lee
JDJenq-Gong Duh
Jenq-Gong Duh

1 October 2021
Verified
Report
Closed access
PDF file
MFM. Jason Fields
M. Jason Fields
MOMike Optis
Mike Optis
JPJordan Perr-Sauer
Jordan Perr-Sauer
ATAustin Todd
Austin Todd
JLJoseph C. Y. Lee
Joseph C. Y. Lee
RHRob Hammond
Rob Hammond
Financial risk resulting from the uncertainty associated with developing, owning, and operating wind power plants remains a barrier to reducing the levelized cost of energy (LCOE). On average, modern wind power plants in the U.S. underperform their expected annual energy output by 3.5-4.5% , with many underperforming by over 10%. To compensate for this uncertainty, investors require a larger return on investment (ROI) and apply "knock-down" factors that mask much of the underlying sources of uncertainty. Wind energy projects thus have reduced access to low-cost capital. Furthermore, operating wind plants often take a simple approach to estimating operations & maintenance (O&M) costs (e.g. straight-line estimates based on similar plants), which can eat into profits. To overcome these issues, the wind industry must improve the models they use for estimating wind plant performance and operations. An industry consortium (IC) requested that the National Renewable Energy Laboratory (NREL) lead a Department of Energy (DOE) working group to benchmark the accuracy of wind power plant energy predictions against real operational data. The IC was also motivated by DOE and NREL's potential to characterize systematic energy underperformance, identify sources of uncertainty, and explore root causes. The Wind Plant Performance Prediction (WP3) project was createdmore » out of this request, and this report represents the successful completion of Phase 1 of the WP3 project. During the project, wind plant owners provided both pre-construction and operational data to NREL. The pre-construction data was provided to wind resource assessment (WRA) consultants so they could conduct energy yield assessments (EYA). NREL took all of the completed EYAs, along with the operational data, and conducted an operational assessment to benchmark the EYA results against actual operational data. Given the large amounts of sensitive data required for this effort, as well as historical opposition to sharing data within industry, successful completion of Phase 1 represents an unprecedented milestone for industry data sharing. To improve the accuracy and confidence of pre-construction EYAs, wind plant owners and investors need better, more certain, energy yield predictions. The WP3 Benchmark Project is an industry-driven response to this reality. For the first time, industry has taken the important step of working together at scale, sharing valuable operational data with DOE and NREL in order to investigate the sources of bias and uncertainty in these energy estimates. This IC provides wind plant preconstruction and operational data to NREL in an organized and documented fashion and provides guidance and feedback as needed. The IC also provides introspection of the design of experiment, key metrics of success, data challenges, analysis best practices, and quality of results. « less

1 May 2019
Verified
Conference Paper
Open access
ZZZhongshun Zhang
Zhongshun Zhang
JLJoseph Lee
Joseph Lee
JSJonathon M. Smereka
Jonathon M. Smereka
YSYoonchang Sung
Yoonchang Sung
LZLifeng Zhou
Lifeng Zhou
PTPratap Tokekar
Pratap Tokekar