Nathee Athigakunagorn

Nathee Athigakunagorn

Auto-generated profile, based on publicly available information

Nathee Athigakunagorn

Assistant Professor, Dept. of Civil Engineering, Faculty of Engineering at Kamphaeng Saen, Kasetsart Univ., Nakhon Pathom 73140, Thailand. ORCID:

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2023 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PDF file
NPNuttapol Patcharachavalit
Nuttapol Patcharachavalit
CLCharinee Limsawasd
Charinee Limsawasd
NANathee Athigakunagorn
Nathee Athigakunagorn
The increasing awareness of sustainability has resulted in the progressive regulation of contractors for public projects to lower the pollution associated with their equipment fleet. Nevertheless, such implementation has not been fully developed yet due to the challenges this presents to contractor profitability and the practical usefulness of decision-support tools. This paper developed a sustainable equipment fleet (SEF) decision-support optimization model with the capability to reduce the CO2 emissions of construction equipment and to minimize the equipment fleet modification cost, subject to the contractor’s budget and time constraints. The model utilizes a multiobjective genetic algorithm (GA) to search for the combination of equipment utilization, equipment model, and sustainable options that provide the optimal equipment fleet options to contractors. The results from the case study of a road construction project demonstrated the tradeoff between emissions and costs, with a wide range of optimal sustainable equipment fleet options. In addition, the fuel equivalent ratio (FER) and the equipment cost-effective ratio (CER) were newly established to normalize pollutant generation and equipment investment and to enable equipment comparisons for facilitating equipment selection by the contractor. The findings suggested that equipment selection involving a lower FER is preferable for sustainability and likewise, a lower CER for the cost aspect. However, effectiveness was measured as the proportion of FER to CER, with higher effectiveness when the proportion was lower. This paper facilitates the assessment and prioritization by construction companies of their equipment investment options to satisfy sustainability requirements.

21 July 2022 in Transport Policy
Verified
Journal Article
Open access
CLCharinee Limsawasd
Charinee Limsawasd
NANathee Athigakunagorn
Nathee Athigakunagorn
PKPhattadon Khathawatcharakun
Phattadon Khathawatcharakun
ABAtiwat Boonmee
Atiwat Boonmee
After the widespread impact of the COVID-19 pandemic, all public transport, including urban rail transit, inevitably adopted a vigorous physical-distancing policy to prevent the disease from spreading among passengers. Adoption of this measure resulted in a substantial reduction in train service capability and required control of the risk contact exposure duration. Thus, this paper proposes the Skip-Stop Strategy Patterns (3S–P) decision-support model to incorporate social distancing constraints in train operations. The 3S–P model is a two-stage, multi-objective optimization model for scheduling train skip-stop patterns to satisfy the study's two main objectives of minimizing the average passenger travel time and unserved passengers. In the proposed model, the first optimization identifies the optimal train skip-stop patterns, while the second assigns these patterns to establish an hourly train schedule. The paper's case study uses data from the Bangkok Mass Transit System (BTS) SkyTrain Silom Line in Bangkok, Thailand and considers the 0.5, 1, 1.5, and 2 m social distancing schemes. The results reveal that the optimal train skip-stop patterns are superior to the all-stop alternative with, on average, a 13.4% faster travel time at the same level of unserved passengers. Furthermore, the non-dominated schedules from the second optimization decrease the numbers of unserved passengers given equal average passenger travel times.

1 January 2015 in Transportation Research Part C: Emerging Technologies
Verified
Journal Article
Closed access
JHJackeline Murillo Hoyos
Jackeline Murillo Hoyos
NANathee Athigakunagorn
Nathee Athigakunagorn
SLSamuel Labi
Samuel Labi

29 December 2017 in Engineering Journal
Verified
Journal Article
Closed access
CLCharinee Limsawasd
Charinee Limsawasd
NANathee Athigakunagorn
Nathee Athigakunagorn

1 September 2023 in Journal of Architectural Engineering
Verified
Journal Article
Closed access
KKKritsada Khun-Anod
Kritsada Khun-Anod
CLCharinee Limsawasd
Charinee Limsawasd
NANathee Athigakunagorn
Nathee Athigakunagorn

1 September 2020 in ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
Verified
Journal Article
Closed access
PDF file
JSJatupol Siripongvakin
Jatupol Siripongvakin
NANathee Athigakunagorn
Nathee Athigakunagorn
The infrastructure construction industry has always been plagued with significant uncertainty. It is therefore crucial for decision makers (DMs) to ascertain suitable investment timing, and there is still a need for a paradigm to assist them. Real options analysis (ROA) is a project evaluation method that allows DMs to incorporate volatility into their analyses. This study uses ROA to create a decision framework to determine the optimal infrastructure investment decision timing. Two types of ROA, the traditional option and the rainbow option, are used in the analysis to examine the impacts of these methods on timing. The paper’s case study involves construction of a gas station in the Bangkok metropolitan region and takes the price of and demand for gas as the sources of uncertainty. The paper also carries out a loss value analysis. The results suggest that the DM should postpone the decision further when volatility increases due to a “wait-and-see” strategy. We introduce loss value to compensate for depreciation in the value of the project due to deferment. The results of the evaluation and the sensitivity analysis confirm that compared to nonconsideration of investment value, consideration can lead to an earlier optimal time for the investment.