A methodology to support and automate the prediction of maintenance intervention alerts in transport linear-asset infrastructures can greatly aid maintenance planning and management. This paper proposes a methodology combining the current and predicted conditions of the assets, and unit components of the infrastructure, with operational and historical maintenance data, to derive information about maintenance interventions needed to avoid later severe degradation. By means of data analytics and machine learning techniques, the proposed methodology generates a prioritized listing, ranked on severity levels, corresponding to the pre-alerts and alerts generated for all assets of the transport infrastructure. The methodology is applied and tested in a real case consisting of a road network with different section classes. The analysis of the results shows that the algorithms and tools developed have good predicting capabilities.
14 September 2017 in IOP Conference Series: Materials Science and Engineering
A large percentage of transport infrastructures are composed of linear assets, such as roads and rail tracks. The large social and economic relevance of these constructions force the stakeholders to ensure a prolonged health/durability. Even though, inevitable malfunctioning, breaking down, and out-of-service periods arise randomly during the life cycle of the infrastructure. Predictive maintenance techniques tend to diminish the appearance of unpredicted failures and the execution of needed corrective interventions, envisaging the adequate interventions to be conducted before failures show up. This communication presents: i) A procedural approach, to be conducted, in order to collect the relevant information regarding the evolving state condition of the assets involved in all maintenance interventions; this reported and stored information constitutes a rich historical data base to train Machine Learning algorithms in order to generate reliable predictions of the interventions to be carried out in further time scenarios. ii) A schematic flow chart of the automatic learning procedure. iii) Self-learning rules from automatic learning from false positive/negatives. The description, testing, automatic learning approach and the outcomes of a pilot case are presented; finally some conclusions are outlined regarding the methodology proposed for improving the self-learning predictive capability.
14 September 2017 in IOP Conference Series: Materials Science and Engineering
The on-going H2020 project INFRALERT aims to increase rail and road infrastructure capacity in the current framework of increased transportation demand by developing and deploying solutions to optimise maintenance interventions planning. It includes two real pilots for road and railways infrastructure. INFRALERT develops an ICT platform (the expert-based Infrastructure Management System, eIMS) which follows a modular approach including several expert-based toolkits. This paper presents the methodologies and preliminary results of the toolkits for i) nowcasting and forecasting of asset condition, ii) alert generation, iii) RAMS & LCC analysis and iv) decision support. The results of these toolkits in a meshed road network in Portugal under the jurisdiction of Infraestruturas de Portugal (IP) are presented showing the capabilities of the approaches.