Pavel Kopecek

Pavel Kopecek

Auto-generated profile, based on publicly available information

Pavel Kopecek

Department of Industrial Engineering and Management, Faculty of Mechanical Engineering, University of West Bohemia in Pilsen

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2016
Verified
Book Chapter
Closed access
JPJiri Polcar
Jiri Polcar
MGMichal Gregor
Michal Gregor
Petr HořejšíPetr Hořejší
Petr Hořejší
PKPavel Kopecek
Pavel Kopecek

1 January 2014 in Periodica Polytechnica Transportation Engineering
Verified
Journal Article
Open access
PDF file
PKPavel Kopeček
Pavel Kopeček
MPMilan Pinte
Milan Pinte
This paper deals with a heuristic approach to material supplies of assembly lines (e.g. automotive industry). A modern method for supplying assembly lines with material is using the so called ‘milk run’ – trains supplying not only one point in assembly production lines but several points. A graph model is used. An analytical solution for creation of trains is not known; most probably it does not exist. Solutions using “brute force” may be very slow. They cannot be used for more than a dozen demands.A repeated random selection of n-tuples of transport demands and building of trains from this selection could be a good way to solve this task. A model of assembly production lines has been developed and the speed of convergence of random selections to a suboptimal solution has been calculated and measured. A thousand selections give good results. These heuristic results have been compared with some deterministic strategies (nearest demand, building of n-tuples).

1 January 2014 in Procedia Engineering
Verified
Journal Article
Open access
PKPavel Kopeček
Pavel Kopeček
This paper deals with a heuristic approach to material supplies of assembly lines (e.g. automotive industry) and to optimization of a stacker which is used in production lines or stores. A modern method for supplying assembly lines with material is using the so called ‘milk run’ – trains supplying not only one point in assembly production lines but several points. A graph model is used. An analytical solution for creation of trains is not known; most probably it does not exist. Solutions using “brute force” may be very slow. They cannot be used for more than a dozen demands.A repeated random selection of n-tuples of transport demands and building of trains from this selection could be a good way to solve this task.A model of assembly production lines has been developed and the speed of convergence of random selections to a suboptimal solution has been calculated and measured. A thousand selections give good results. These heuristic results have been compared with some deterministic strategies (nearest demand, building of n-tuples).A similar approach has been used for optimization of a stacker in a workshop and in a store

1 January 2011
Verified
Book Chapter
Open access
PKPavel Kopecek
Pavel Kopecek

1 January 2017
Verified
Book Chapter
Open access
JPJiri Polcar
Jiri Polcar
Petr HořejšíPetr Hořejší
Petr Hořejší
PKPavel Kopecek
Pavel Kopecek
MLMuhammad Latif
Muhammad Latif

27 June 2011 in MM Science Journal
Verified
Journal Article
Closed access
PKPavel Kopecek
Pavel Kopecek