Vadim Tkachenko

Vadim Tkachenko

Auto-generated profile, based on publicly available information

Vadim Tkachenko

Національний технічний університет України «Київський політехнічний інститут імені Ігоря Сікорського», Україна

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2019
Verified
Conference Paper
Closed access
VPVladimir Popov
Vladimir Popov
MFMykola Fedosenko
Mykola Fedosenko
VTVadim Tkachenko
Vadim Tkachenko
DYDmytro Yatsenko
Dmytro Yatsenko
A lot of forecasting methods and models have been proposed by researchers for different applications with the main issue to improve their accuracy. Electrical loads and energy consumption forecasting is one of the most important task in power system operation and planning. However, in some cases we need to solve this problem in the absence of reliable and adequate historical data. In this regard paper presents the development of fuzzy time series for electrical energy consumption forecasting. The experimental data of monthly energy consumption is used to demonstrate the model's effectiveness.

1 December 2022
Verified
Book Chapter
Closed access
PDF file
VPVladimir Popov
Vladimir Popov
VTVadim Tkachenko
Vadim Tkachenko
OYOlena Yarmoliuk
Olena Yarmoliuk
DYDmytro Yatsenko
Dmytro Yatsenko

29 June 2015 in Eastern-European Journal of Enterprise Technologies
Verified
Journal Article
Open access
PDF file
ВПВладимир Андреевич Попов
Владимир Андреевич Попов
ВТВадим Владиславович Ткаченко
Вадим Владиславович Ткаченко
СБСахрагард Саид Банузаде
Сахрагард Саид Банузаде
АЖАндрей Александрович Журавлев
Андрей Александрович Журавлев
The authors have shown that the existing reliability management experience abroad because of the topology specifics, switching devices, relay protection and automation tools used is not fully applicable to domestic distribution networks. In this regard, new modeling and optimization methodology of power supply reliability parameters, oriented also at the appearance possibility of distributed generation sources in the structure of electric networks was proposed. The paper presents the results of a comparative analysis of the application conditions of distributed generation tools with different equipment of electrical networks by automatic and non-automatic switching devices, in order to substantiate optimal connection zones of generating sources under different application conditions. Recommendations for setting relay protection tools under the joint use of reclosers and fuses in the networks with distributed generation sources to eliminate false alarms and unwarranted disconnection of fuses at transient faults were developed. It is shown that under the valuation of reliability indicators, cost estimate of measures on providing electricity networks with required switching and protective devices serves as private objective function during multicriterion substantiation of optimal integration options of distributed generation into electric networks.

7 February 2016 in Eastern-European Journal of Enterprise Technologies
Verified
Journal Article
Open access
PDF file
СБСахрагард Саид Банузаде
Сахрагард Саид Банузаде
ВПВладимир Андреевич Попов
Владимир Андреевич Попов
ВТВадим Владиславович Ткаченко
Вадим Владиславович Ткаченко
АЖАндрей Александрович Журавлев
Андрей Александрович Журавлев
ДШДенис Владимирович Шпак
Денис Владимирович Шпак
In order to minimize costs of power supply companies and potential investors, the study related to the formation of a strategy to ensure the rated level of power supply reliability in conditions of integration of distributed generation sources into electrical networks is carried out in the paper. The possibility of the logframe use to evaluate the integrated reliability indicators in the conditions of equipment of electrical networks with modern switching devices and presence of generating sources under different settings and locations is shown.The experimental computations reveal that only a coordinated solution of the problems of electrical network partitioning in terms of reliability optimization and implementation of technical specifications to enable their "island" mode at the occurrence of distributed generation sources makes it possible to make the most cost-effective decisions.The results can be directly used in the practical work of operational units and prospective development departments of energy supply companies, serve as an important component in the multicriteria evaluation of application options of distributed generation.

12 October 2026 in POWER ENGINEERING: economics, technique, ecology
Verified
Journal Article
Open access
PDF file
VPVladimir Popov
Vladimir Popov
OYOlena Yarmoliuk
Olena Yarmoliuk
VTVadym Tkachenko
Vadym Tkachenko
VNVladyslav Natalych
Vladyslav Natalych
DBDenys Beregovyi
Denys Beregovyi
The article considers the issues of increasing the effectiveness of solving the most widespread and relevant for electric power distribution systems problem of determining the optimal locations of normally open points in the circuits of distribution networks, aimed at complex increasing the efficiency of their operation and, first of all, minimizing electric energy losses. The future restoration and development of the energy sector of Ukraine is associated with the wide involvement of local energy resources in the power supply processes, primarily renewable ones. At the same time, it is demonstrated that under the conditions of active use of distributed renewable energy sources, the traditional formulation of the problem of determining the optimal places of normally open points loses its meaning. This is due to the fact that the unstable generation from the side of the mentioned energy sources does not allow us to consider daily modes over longer time intervals (for example, during a season of or half the year) as the relatively homogeneous. However, this was this basis condition for the traditional formulations of the problem of determining the optimal place of open points, which are unchangeable over the long-time intervals. In this regard, the paper proposes sequential steps for adapting approaches to solving the mentioned above problem to the new conditions of distribution network operation. The specified proposals are synchronized with the capabilities of both hardware and information support of distribution systems, justify and contain the following stages. First, a change in the content of the objective function is considered. In this case, the decision is made not on the basis of an analysis of the modes of a characteristic day of a certain integral period of time, but the entire period of time is analyzed, based on the approach proposed in the article. In this case, various network operation scenarios are analyzed and the duration of each of them is taken into account. It is clear that the implementation of such a solution does not require additional investment. At the next stage, the feasibility of partially replacing existing switching devices with similar devices with remote control and simultaneous streamlining of the use of the existing information is analyzed. Such a solution makes it possible to dynamically change the topology of the distribution line in according with a corresponding change of parameters of modes of operation, which take place even during each separate day. Such a solution requires limited additional investments for its implementation. The most effective result is achieved through the implementation of modern technologies based on the use of power electronics, which allows for real-time mode control. But this requires significant investments not only for the technical arrangement of networks, but in required a radical change in the information support. At the same time, this option for controlling the modes of distribution networks can be considered as the basis for the future implementation of the Smart Grid concept in the electrical networks of Ukraine.

9 March 2023 in POWER ENGINEERING: economics, technique, ecology
Verified
Journal Article
Open access
PDF file
VPV. Popov
V. Popov
OKO. Kotsar
O. Kotsar
VTV. Tkachenko
V. Tkachenko
DDD. Derevianko
D. Derevianko
OBO. Borychenko
O. Borychenko
The concept of the "green" energy transition involves, first of all, the transformation of views on the development of energy, in particular, the electric power industry in the context of its greening and decarbonization, with special attention to the problems of combating climate change within the framework of the sustainable development paradigm. Such a transformation requires the education of high-quality electrical enguneers, who are aware of the new role and place of the consumer in the liberalized electricity markets within the Smart Grid concept. End-to-end three-level training at the Department of Power Supply of Igor Sikorsky Kyiv Polytechnic Institute bachelors, masters (professional and scientists) and Ph.D. during the 25 years under the educational and professional programs "Systems for providing consumers with electrical energy" and "Energy management and energy-efficient technologies" specialty 141 "Electric power engineering, electrical engineering and electromechanics" in the field of knowledge 14 "Electrical engineering" made it possible to provide industrial, energy, communal, commercial and other companies and organizations, as well as authorities and local self-governments of Ukraine with qualified specialists in the power supply of the built environment, industrial enterprises and agricultural objects and energy managers, capable of jointly solving complex the task of reliable electricity supply to consumers with high-quality electrical energy with the introduction of energy-efficient technologies, reduction of the use of fossil fuels and reduction of harmful emissions on the basis of sustainable development.