Reza Ramezanian

Reza Ramezanian

Auto-generated profile, based on publicly available information

Reza Ramezanian

Department of Industrial Engineering, K.N. Toosi University of Technology, Tehran, Iran

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2010 in International Journal of Industrial Engineering Computations
Verified
Journal Article
Closed access
MSMohammad Kazem Sayadi
Mohammad Kazem Sayadi
RRReza Ramezanian
Reza Ramezanian
NGNader Ghffarinasab
Nader Ghffarinasab

1 August 2017 in Transportation Research Part E: Logistics and Transportation Review
Verified
Journal Article
Closed access
RRReza Ramezanian
Reza Ramezanian
ZBZahra Behboodi
Zahra Behboodi

1 September 2015 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
RRReza Ramezanian
Reza Ramezanian
AEAbdullah Ezzatpanah
Abdullah Ezzatpanah

1 August 2016 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
DRDonya Rahmani
Donya Rahmani
RRReza Ramezanian
Reza Ramezanian

1 January 2012 in Expert Systems with Applications
Verified
Journal Article
Closed access
RRReza Ramezanian
Reza Ramezanian
DRDonya Rahmani
Donya Rahmani
FBFarnaz Barzinpour
Farnaz Barzinpour

20 February 2013 in International Journal of Production Research
Verified
Journal Article
Closed access
BNBehdin Vahedi Nouri
Behdin Vahedi Nouri
PFParviz Fattahii
Parviz Fattahii
RRReza Ramezanian
Reza Ramezanian
Job scheduling and maintenance activities scheduling are two important issues in production management, which are often addressed separately. In this paper, the non-permutation flow shop scheduling problem with learning effects and flexible maintenance activities is studied. Each machine has a number of preventive maintenance activities that should be finished within specific time intervals. The aim is to simultaneously determine the sequence of jobs and the finish time of maintenance activities for minimising the sum of tardiness costs and maintenance costs. A mixed integer linear programming model is proposed to formulate the problem. Owing to the high complexity of the problem, an improvement heuristic method and a hybrid meta-heuristic algorithm based on the simulated annealing algorithm and firefly algorithm is presented to find nearly optimal solutions for medium and large problems. To obtain better and more robust solutions, the Taguchi method is used in order to calibrate the hybrid algorithm parameters. Finally, the computational results are provided for evaluating the performance and effectiveness of the proposed solution approaches.