22 April 2024 in Proceedings of the National Academy of Sciences of the United States of America
California, a pioneer in EV adoption, has enacted ambitious electric vehicle (EV) policies that will generate a large burden on the state’s electric distribution system. We investigate the statewide impact of uncontrolled EV charging on the electric distribution networks at a large scale and high granularity, by employing an EV charging profile projection that combines travel demand model, EV adoption model, and real-world EV charging data. We find a substantial need for infrastructure upgrades in 50% of feeders by 2035, and 67% of feeders by 2045. The distribution system across California must upgrade its capacity by 25 GW by 2045, corresponding to a cost between $6 and $20 billion. While the additional infrastructure cost drives the electricity price up, it is offset by the downward pressure from the growth of total electricity consumption and leads to a reduction in electricity rate between $0.01 and $0.06/kWh by 2045. We also find that overloading conditions are highly diverse spatially, with feeders in residential areas requiring twice as much upgrade compared to commercial areas. Our study provides a framework for evaluating EVs’ impact on the distribution grid and indicates the potential to reduce infrastructure upgrade costs by shifting home-charging demand. The imminent challenges confronting California serve as a microcosm of the forthcoming obstacles anticipated worldwide due to the prevailing global trend of EV adoption.
18 February 2026 in Energy Strategy Reviews
1 November 2022 in Journal of Physics: Conference Series
As the backbone Grid for STATE GRID Corporation of China, UHV projects require high safety and reliability. 1000kV GIS switchgear is the most important part of UHV AC substation. Deepening the research on its layout and improving the safety and stability can provide strong technical support for the subsequent UHV AC project construction, which is of great significance. The defect and failure rate of indoor GIS is lower than that of outdoor GIS, but the initial cost of indoor GIS is higher than that of outdoor GIS layout scheme. According to the operation related data, this paper carries out the design scheme research, technical scheme comparison and life cycle analysis of indoor and outdoor layout of 1000kV GIS equipment.