Ge Zhang

Ge Zhang

Auto-generated profile, based on publicly available information

Ge Zhang

Institute of High Energy Physics, Chinese Academy of Sciences (CAS), Beijing 100049

Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2026 in Journal of Instrumentation
Verified
Journal Article
Closed access
PDF file
YMYinglin Ma
Yinglin Ma
QWQingbiao Wu
Qingbiao Wu
LLLun Li
Lun Li
SZSixuan Zhuang
Sixuan Zhuang
HDHaobo Deng
Haobo Deng
GZGe Zhang
Ge Zhang
The Phase-II project of the China Spallation Neutron Source (CSNS-II) adopts a parallel construction-and-operation mode to minimize interference with ongoing scientific research. However, this mode presents severe radiation protection challenges. The project requires excavation of overlying soil outside the existing tunnel for tunnel connection; after soil removal, the simulated dose rate outside the tunnel reaches 5.5 mSv/h, considerably exceeding the safety limit, necessitating temporary shielding. Shielding design based on the conventional 1 W/m beam loss assumption is infeasible due to high cost and insufficient space. Accordingly, this work performs inverse estimation of beam loss via in-situ radiation measurements to optimize the temporary shielding design. Given the uncertainty of beam loss, continuous monitoring of radiation dose outside the shielding is required, but conventional fixed dosimeters are unsuitable owing to the lack of stable power supply at the construction site. A solar-powered mobile radiation monitoring system was therefore developed to enable long-term continuous monitoring in off-grid construction areas. The monitoring data are integrated into the radiation safety interlock system, which automatically cuts off the beam when the dose rate exceeds the threshold due to beam loss, thereby mitigating radiation risks. Furthermore, to ensure occupational exposure control for construction personnel — who cannot wear personal dosimeters on-site — combined dosimeters are deployed at key dose concern locations, implementing an area-monitoring-based surrogate for personal dosimetry. Field application demonstrates that the mobile monitoring system realizes long-term continuous monitoring over multiple accelerator operation cycles, and the temporary shielding reduces the dose rate in the unrestricted construction zone to below the management target of 0.25 μSv/h. The results effectively guarantee radiation safety during CSNS-II parallel construction and operation, and provide technical reference for similar large-scale scientific facilities.