The paper presents chosen elements of a dynamic analysis of a rail bridge located on the CMK trunk railway line in Poland. The calculations cover solving an eigenvalue problem for the structure (theoretical modal analysis) using several computational models created with different discretization methods (different accuracy levels) and determination of the dynamic response of the bridge span (time-history analysis - integration of equations of motion) to loading with HSLM train models as per PN-EN 1991-2. The results were compared to the current code and regulations relating to high-speed rail systems.
Idea to travel faster and faster is as old as human civilization. Different ways were used to move from point to point over centuries. The railways, cars, air-plains and rockets were invented. Each of them have limitations and advantages. Therefore, people always look for other, better solutions. One of them is “vacuum rail” moving inside a tube, known also as a Hyperloop. The number of problems to be solved is extremely high. This paper is devoted to civil engineering problems only e.g. viaducts, tunnels, stations. It is necessary to consider the kind of sub- and superstructure supporting the tube, influence of changes of ambient temperature and solar radiation, the way to ensure safety and structural integrity of the structures in case of fire, decompression of a structural tube and air-tightening, occurrence of accidents etc. Taking into account the fact that bridge and tunnel standards do not include information relating to above mentioned problems it is interesting to determine rules for design, construction and maintenance of such structures.
On the 14th of February, 2015, a huge fire broke out on Łazienkowski Bridge; a five span bridge, 423 m long and 28 m wide, built in the years 1972-74. It was a fully steel structure with four plate girders and orthotropic deck. The fire started under the first span during the replacement of wooden service decks. The next day, the Department of Bridges of the Warsaw University of Technology was designated to conduct an expertise material investigation, geometrical verification, and FEM model analysis. The subject of this paper concentrates on geometrical issues. The main difficulty of this task was the lack of full reference data regarding the bridge's original structure. The old design was incomplete and there was no actual surveying results for the undamaged structure. As a conclusion, some remarks focused on surveying measurements and on the final decision regarding this bridge are given. It was eventually exchanged into a brand new one and put into public use on the 28th of October, 2015.
The phenomenon of vibration of buildings and other structures induced by different sources of vibrations is well known. Some of these sources are vibrohammers used to press in sheet piling, pile drivers with hydraulic hammer to drive in reinforced concrete pre-cast piles and vibroflots suspended to mobile cranes which are used to strengthen subsoil by vibroflotation technology.
The paper presents the steel arch pedestrian bridge with composite polymer deck in the central span and concrete plate on exterior segments. The carbon fiber stays are proposed to join girder with the deck. The arch girder is designed as a bent steel pipe with diameter 1200 mm. The span of the arch is 40.0 m and inclination is 17°. Some aspects of the design studies are presented with description of respective analyses. A special attention is paid to the dynamics, wind and thermal analysis. This bridge is the second one build in Poland using structural elements made of composite polymers. The structure will be constructed in year 2005 crossing new expressway near Poznan in western Poland.