Ping Xu

Ping Xu

Auto-generated profile, based on publicly available information

Ping Xu

Xiangtan Univ, Sch Civil Engn, Dept Geotech Engn, Xiangtan, Peoples R China

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 March 2022 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Closed access
PDF file
PXPing Xu
Ping Xu
XZXiong Zhu
Xiong Zhu
SQShifan Qiao
Shifan Qiao
GWGang Wang
Gang Wang
PYPengkun Yu
Pengkun Yu

7 April 2020 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
SQShifan Qiao
Shifan Qiao
PXPing Xu
Ping Xu
JTJidong Teng
Jidong Teng
XSXiao Sun
Xiao Sun
The landslide signs were discovered in a high filling embankment slope, which was located on an express highway construction site in Guizhou, China. According to the in-situ monitoring results, the landslide mechanism and the stabilization effect of the portal anti-slide pile were preliminarily analyzed. The sliding shear zone of the landslide was obtained by the in-situ monitoring. Tw o numerical models with imposed sliding shear zone were established to analyze the evolution of the landslide instability and the stabilizing effect of the portal anti-slide pile. The comparative analysis of in-situ monitoring data and numerical simulation result shows that the two numerical model are reliable. Furthermore, the numerical model of embankment slope that reinforced by portal anti-slide pile was implemented to analyze the structural behavior of pile under the different pile parameters, and the pile-soil interaction was considered in the numerical model. The influence of the pile parameters (pile spacing, pile row spacing, and linked beam size) on the stabilization effect, structural deformation, and economic benefit were studied. The numerical results provide a guide for determining the optimum parameters of the portal anti-slide pile.

13 November 2024 in Transportation Geotechnics
Verified
Journal Article
Closed access
PXPing Xu
Ping Xu
WZWei Zhao
Wei Zhao
SQShi-fan Qiao
Shi-fan Qiao
HDHui Dong
Hui Dong

31 December 2023 in Sensors
Verified
Journal Article
Open access
PDF file
SQShi-fan Qiao
Shi-fan Qiao
YLYiqi Liu
Yiqi Liu
CFChaobo Feng
Chaobo Feng
CZCai ziyong Cai ziyong
Cai ziyong Cai ziyong
DCDaolong Chen
Daolong Chen
PXPing Xu
Ping Xu
Water gushing is a common engineering geological disaster in the process of foundation pit construction. Its successful judgment directly affects the safety of engineering construction. Taking the case of water gushing at the bottom of the foundation pitas as a research object, the mechanism and treatment of water gushing in foundation pits, the stability against water gushing, and its influencing factors are analyzed with a field investigation, field testing, and theoretical calculation. The calculation formula for the safety factor and critical thickness of the foundation pit against surges, considering the influence of multiple factors, is deduced. The influence of the height of the confined water level, the thickness of the water-resisting layer, the shear strength of the soil mass, the reinforcement depth of the soil mass in the pit, and the diameter of the bearing pile in the pit on the safety factor of the foundation pit surge are expounded. In addition, measures such as the reinforcement of the soil mass in the passive area in the pit, the increase in the thickness of the water-resisting layer, and the reduction in the confined water level are proposed to improve the anti-surge stability of the foundation pit. A new monitoring method is proposed for characterizing uplift deformation at the bottom of the pit without affecting normal construction. The research results show that: (1) the minimum safety factor against surges, considering multiple factors, is 1.455, and the critical thickness is 5.87 m, which is in line with specifications. (2) Measures such as reinforcing the soil in the passive zone of the pit, increasing the thickness of the water-insulating layer, and lowering the bearing pressure level are used to improve the stability of the pit against surges. (3) The pit, obtained by the pit bottom counter-pressure, pumping water out of the pit, and the timely construction of the pit bottom bedding to block the program, exhibits a measured maximum bottom plate pressure of 115.189 kPa, and the deformation corresponding to the method proposed in this paper is 1.406 mm, which is better disposed in the field. The research results provide a reference basis for the judgment of anti-surge stability of foundation pits and similar engineering applications.