1 January 2018 in Procedia CIRP
17 December 2022 in International Journal of Production Research
Lean Production Systems are enterprise-specific, methodical frameworks for the continuous orientation of all enterprise processes to the customer in order to achieve overall objectives. Due to an increasing complexity of the digital transformation, the design of Lean Production Systems 4.0 is a challenging task for industrial engineering practice. For this, academia and industrial practice were analysed in a combined approach of a systematic literature review and a field study. The systematic literature review of 62 out of 1600 scientific papers shows that especially the tools, processes, and methods in Lean Production Systems are subject to digital transformation. By involving industrial practice in a field study, quantitative and qualitative insights were used to check scientific hypotheses and identify practical requirements by industrial engineers. As a result, 10 guidelines for the design of future Lean Production Systems 4.0 are derived. The practical implications of this paper enhance the evolution of enterprise-specific Lean Production System 4.0 frameworks.
1 January 2018 in Procedia CIRP
8 September 2017 in International Journal of Modern Education and Computer Science
This article shows a novel approach to semantically align two domain contexts in a distributed system based on the theory of Information Flow [1], also known as Channel Theory. In this article, we propose a 2step approach to cope with the increasing complexity in constructing the channels, when the channel theory is applied in a complex environment, for example in the area of smart manufacturing. We describe why the methods that had been used so far for constructing the channel might not be suitable for such a complex environment and introduce the main components of our approach. Furthermore, we are explaining how these components work together by using an example from the manufacturing area where product specifications have to be aligned with the production capabilities of manufacturing equipment. Within this example, in the first step a high-level description of production steps is mapped to production processes, and in the second step, a detailed description of the production steps in question is mapped to available equipment and tooling that is related to the filtered production processes from step 1.