Alessandra Davolio

Alessandra Davolio

Auto-generated profile, based on publicly available information

Alessandra Davolio

Instituto de Computao (IC), Artificial Intelligence Laboratory (Recod.ai), Universidade Estadual de Campinas (UNICAMP), Campinas, So Paulo, Brazil

Research Focus & Metrics

Academic Career Length

22Years (2005-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2015 in Journal of Petroleum Science and Engineering
Verified
Journal Article
Closed access
CMCélio Maschio
Célio Maschio
ADAlessandra Davolio
Alessandra Davolio
MCManuel Gomes Correia
Manuel Gomes Correia
DSDenis José Schiozer
Denis José Schiozer

1 June 2015
Verified
Conference Paper
Closed access
PDF file
FMF.B. Mesquita
F.B. Mesquita
ADA. Davolio
A. Davolio
DSD.J. Schiozer
D.J. Schiozer
The petroleum industry has a high demand for production forecasting under uncertainties, which is performed through probabilistic approaches. Although these approaches have been used very often in recent years, one of the challenges to their application is the development of a methodology with multiple scenarios that honor the dynamic data available (history matching procedures). Many works, which propose different probabilistic history matching approaches have been published in the literature but are based on methods that demand a very high number of reservoir simulation runs. Thus, to make this type of application feasible, these methods rely on the application of proxy models, which, however, are not able to capture the full physical behavior of the model. Different from those methods, this work proposes a methodology for uncertainties reduction of reservoir properties integrated with an assisted history matching procedure, in a multi-objective approach that does not employ proxies. The methodology proposed is an extension of a procedure previously published by our group, which has shown to be an efficient way to perform probabilistic history matching. At each iteration of the process, the model uncertainties are combined through a robust sampling technique, which originates a set of model realizations that are then simulated. The results are evaluated for all Objective Functions (OF), namely, the quadratic deviations of all well rates and pressures. This work proposes the use of quantitative tools to perform the matching: (1) indexes that quantify the matching quality for each OF and allow prioritizing the worst OF to be matched and (2) a bi-dimensional matrix that supports the identification of sources to the highest deviations and gradual model properties updating. At the end of the procedure, good models (which must present satisfactory matching for all OF) are filtered and further employed in production forecasting under uncertainties. The methodology is applied to a synthetic model (UNISIM-I-H) based on the Namorado field in Brazil. The results show not only the gradual improvement of all OF during the matching procedure but also and, more importantly, how the reservoir uncertainties are updated based on the tools proposed here. The proposed indicators make the application systematic and can be used for automatizing the process. The methodology is able to deal with complex cases, especially those involving several wells and uncertainties with non-linear interaction among them. The developments provide robustness to the application, resulting in a more reliable production forecast and management of the field.

23 January 2018 in Journal of Geophysics and Engineering
Verified
Journal Article
Closed access
PDF file
ADAlessandra Davolio
Alessandra Davolio
DSDenis Jose Schiozer
Denis Jose Schiozer

24 October 2017 in Petroleum Geoscience
Verified
Journal Article
Closed access
MMMasoud Maleki
Masoud Maleki
ADAlessandra Davolio
Alessandra Davolio
DSDenis José Schiozer
Denis José Schiozer
The Norne Field started production in 1997 and up to 2006 the field experienced intense production activity, making the Norne benchmark case an ideal candidate to explore the challenges in interpreting complex time-lapse seismic data. Seismic amplitude changes and time-shifts are used as the first level approach to interpret the time-lapse differences and to update reservoir models. A common alternative is to invert the seismic data and obtain acoustic impedance variations caused by production activity, and to evaluate their possible interpretations. For this case study, we use a 4D inversion approach to invert the base (2001) and monitor (2006) seismic surveys in order to provide field-wide insights for the Norne benchmark case. We extensively interpret the observed 4D inversion anomalies and decouple, as much as possible, the effects of fluid and pressure variations, supported by production and reservoir engineering data. Moreover, we compare the inversion results with the simulation model from the Norne benchmark case to suggest areas of future modification to the simulation model. This research is intended as a resource to improve the quality of history matching or other 4D inversion methods applied to the Norne benchmark case, and to demonstrate a detailed time-lapse seismic interpretation within the reservoir segments of the Norne Field. Supplementary material: Well-history data of six producer and injector wells is available at https://doi.org/10.6084/m9.figshare.c.3890251

27 October 2014
Verified
Conference Paper
Closed access
PDF file
FAForlan La Almeida
Forlan La Almeida
ADAlessandra Davolio
Alessandra Davolio
DSDenis José Schiozer
Denis José Schiozer
Assisted history matching procedures are usually implemented within an optimization procedure, where the goal is to minimize the object function, which is written in terms of the error between observed and simulated data. One of the problems of the process is that the objective function represented by a single value is not sufficient to express the complexity of the problem. The errors that are normally measured for each well and for all production rates and pressure are converted to a single value; usually the norm of all error vectors. If the problem is well behaved and the objective function quickly converges within a desired tolerance, this would not be a problem, but this is usually not the case for complex history matching processes, since it is very difficult to find a model (or a set of them) that matches with a reasonable tolerance the production profiles for every wells. This work proposes a new approach to deal simultaneously with several objective functions (for instance, well rates and pressure). The methodology follows a probabilistic approach where several simulation models are handled during the entire procedure. The initial step is to generate several simulation models by combining the most important uncertainties of the reservoir. Then, an iterative procedure is performed to iteratively change the reservoir attributes and filter the models that are closer to history data. This procedure encompass a re-characterization step, where the probability of the attributes are updated, global multipliers are applied and local changes are made around problematic wells in order to provide a set of model that yield production and pressure curves with better dispersion compared to history data for every well. The key point of the methodology is that for every iteration the errors of each model, well and objective function can be visualized in a very concise plot that is based on the normalized quadratic error of each curve. The plot clearly shows global and local problems of the set of simulation models, so it is a good indicator of the changes to be made in the next iteration. Another point to highlight is that the same type of iterative procedure is performed to integrate 4D seismic into the process. Thus, after selecting a set of models with a good representation of well history data the same iterative process is repeated to generate a new set of models that match 4D seismic data as well. Thus, the proposed methodology integrates 4D seismic and well history data to reduce uncertainties with a probabilistic approach. To validate the methodology an application is shown where it can be seen the gradual improvement achieved for the models along the iterations. Introduction The history matching is a well-known procedure used to calibrate reservoir simulation models with dynamic data, in order to improve reliability in the production predictions. The process is normally very complex, mainly due to three aspects: (1) the number of uncertain attributes to be changed in the process, (2) multiple possible solutions with similar quality (considering a deviation from the observed data) and (3) number of functions to be calibrated. To make the process viable, the number of uncertainties is reduced based on the knowledge of the problem and the results of a sensitivity analyses that can indicate the most relevant attributes. In this work, the most relevant uncertainties are the attributes that represent the spatial variation of reservoir properties (facies, porosity, permeability, net-to-gross ratio). These properties are combined with other attributes using a Discretized Latin Hypercube technique (called DLHG by Schiozer et al., 2014).

16 August 2012 in Journal of Geophysics and Engineering
Verified
Journal Article
Closed access
ADAlessandra Davolio
Alessandra Davolio
CMCélio Maschio
Célio Maschio
DSDenis José Schiozer
Denis José Schiozer