12 February 2020 in International Journal of Construction Management
SOSunday Olusanya Olatunji
The construction industry continues to suffer from efficiency and productivity losses such as delays. The effects of delays may include time and cost overruns, litigation and project abandonment. Thus, the global research domain is saturated with studies investigating the causes of construction delay. However, despite the rising trend of construction globalization, a systematic review of what has been achieved so far in construction delay research is lacking. Such a study will synthesize extant data from previous studies to illustrate the global picture and will be of potential benefit to concerned stakeholders. Consequently, this study presents an overall review of studies on the causes of construction delays and executes a meta-data analysis utilizing Relative Importance Index (RII) values from some influential studies in the last 15 years. 36 common delay causes investigated globally were identified, and the effect summaries derived from the meta-analysis showed that the top five causes include: “contractor’s financial difficulties”, “delay in approval of completed work”, “slow delivery of materials”, “poor site organization and coordination between various parties”, and “poor planning of resources and duration estimation/scheduling”.
1 April 2021 in International Journal of Management Science and Engineering Management
SOSunday Olusanya Olatunji
The last half-century has witnessed an astronomical rise in the number of tall building projects in urban centers globally. These projects however frequently experience delays and total abandonment due to economic reasons. This study presents the application of Machine Learning techniques in the systematic development of a model to estimate the preliminary cost of tall building projects. The techniques considered include Multi-Linear Regression Analysis (MLRA), k-Nearest Neighbors (KNN), Artificial Neural Networks (ANN), Support Vector Machines (SVM), and Multi Classifier Systems. Twelve models were developed and compared using standard performance metrics. The results revealed that the best performing model was based on a Multi Classifier System using KNN as the combining classifier, with a Correlation Coefficient (R2) of 0.81, Root Mean Squared Error (RMSE) of 6.09, and Mean Absolute Percentage Error (MAPE) of 80.95%. This research showed the potential of modern digital technologies such as machine learning to solve problems of the construction industry. The procedure described in this study is of significant value to research and practice in the development of preliminary cost estimation models. The developed model can function as a decision support tool in the preliminary cost estimation stage of tall building projects.
1 October 2016 in Journal of Performance of Constructed Facilities
This paper presents a holistic postoccupancy evaluation (POE) framework and its application to a campus residential facility. The development of a framework was based on an extensive review of literature and an identification of a comprehensive set of performance indicators. Multiple evaluation techniques were employed, including the review of existing documents, interviews, walkthroughs, questionnaire surveys, and spot measurements. The importance-satisfaction (IS) matrix was utilized to identify building performance successes and failures. The study shows that occupants are moderately satisfied with their residential environment. Specific issues identified were related to HVAC and lighting systems, among others. The holistic POE framework will help to derive more qualitative feedback in housing evaluation studies for more reliable decision making. This study bridges the research gap for the need for more holistic forms of POE in the facilities management sector. The recommendations provided in t...
8 April 2019 in International Journal of Building Pathology and Adaptation
Purpose: The purpose of this paper is to develop a comprehensive list of key performance indicators (KPIs) that can be employed in determining the functional performance of academic and research laboratory facilities.Design/methodology/approach: The study employed a two-phase approach. First, a thorough literature review was conducted to identify potential KPIs specific to the performance of laboratory facilities. This was followed by an assessment of the KPIs by 12 respondents including 6 professionals and 6 users. The KPIs were arranged in the form of a questionnaire survey containing response columns for agree/disagree, and importance rating scales for evaluation. The relative importance index values were also computed.Findings: The result of the study was a comprehensive list of 161 KPIs classified into nine categories including: space, access/circulation, utilities and waste, environmental conditions, furniture, appearance/finishes/image, communications, storage within the space and special building features. These KPIs were perceived to be at varying levels of importance by the respondents.Originality/value: Though previous studies developed KPIs for the performance of facilities, these KPIs are not universal. Thus, the originality of this study is in its identification of a comprehensive set of KPIs unique to the design, evaluation and management of research and academic laboratory facilities.
31 March 2021 in Journal of Construction Engineering, Management & Innovation
KMKing Fahd University of Petroleum and Minerals
King Fahd University of Petroleum and Minerals
UMUniversiti Teknologi Malaysia
Universiti Teknologi Malaysia
IUImam Abdulrahman Bin Faisal University
Imam Abdulrahman Bin Faisal University
11 May 2017 in Built Environment Project and Asset Management
Purpose: The purpose of this paper is to present an assessment of the challenges to the implementation of building management systems (BMS) in Saudi Arabia, during the life cycle of building projects.Design/methodology/approach: Review of literature and interviews were conducted with professionals to identify and synthesize the challenges to the implementation of BMS in Saudi Arabia. This formed the basis of three questionnaire surveys that were designed utilizing a five-point Likert scale, and consisted of 32 challenges. The surveys were assessed by representatives of architectural/engineering (A/E) firms, BMS installation sub-contractors and facilities managers to calculate the effect index of each challenge.Findings: The top influential challenges pertaining to the briefing and design phase includes “inappropriate selection of the BMS,” “inappropriate selection of the A/E team”; installation and final acceptance phase includes “inappropriate selection of sub-contractors to install the BMS” and “inappropriate selection of the BMS suppliers,” operation and maintenance phase includes “inadequate initial training for the BMS facility personnel,” “poor operation and maintenance activities.”Practical implications: The paper is of practical benefit to stakeholders in the building industry, as it allows for the development of an effective BMS implementation plan.Originality/value: The study increases the level of awareness in the building industry about the challenges that influence the implementation of BMS.