Kai Xu

Kai Xu

Auto-generated profile, based on publicly available information

Kai Xu


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 June 2025
Verified
Book Chapter
Open access
PDF file
CWChendi Wang
Chendi Wang
XKXiaoyue Kang
Xiaoyue Kang
KXKai Xu
Kai Xu
YLYouliang Liu
Youliang Liu
XMXiaolong Ma
Xiaolong Ma
DLDongxing Liu
Dongxing Liu
Taking the Shangmajia Plateau Highway Tunnel Project as an example, based on the mechanized supporting construction plan, the research focused on the mechanized supporting advanced geological prediction, excavation, initial support, concrete lining and other processes of the tunnel. Through the comparative analysis of traditional construction technology, it is concluded that the proposed mechanized construction equipment supporting technology has better applicability to the plateau region, the construction efficiency has been greatly improved, which promotes the overall improvement of the level of mechanization of plateau tunnel construction, ensures the construction safety of the operators and the construction environment, and alleviates the tense human resources of plateau tunnel construction. The optimal mechanical supporting plan suitable for the drilling and blasting construction of plateau highway tunnels has been formed, and the construction goals of mechanization, less manpower and intelligence of plateau tunnel construction have been achieved.

23 September 2026 in Progress in Additive Manufacturing
Verified
Journal Article
Closed access
PDF file
ZYZhe Yang
Zhe Yang
WLWenfeng Li
Wenfeng Li
KXKai Xu
Kai Xu
YZYunteng Zhou
Yunteng Zhou
HLHuahua Liang
Huahua Liang
Miao ZhaoMiao Zhao
Miao Zhao

13 June 2025
Verified
Book Chapter
Open access
PDF file
YHYichun Huang
Yichun Huang
XKXiaoyue Kang
Xiaoyue Kang
KXKai Xu
Kai Xu
XCXingyu Chen
Xingyu Chen
DLDongxing Liu
Dongxing Liu
To address the mismatch between construction techniques and efficiency in the context of mechanized construction, as well as the construction risks associated with significant uneven deformation faced by tunnels in shallow-buried and biased portal sections, an innovative approach using the “double-sided heading method for the upper hemisection and bench method for the lower hemisection” is proposed to replace traditional construction methods. Numerical simulations were conducted to calculate the deformation characteristics of the tunnel structure and surrounding rock. The results indicate: (1) The deformation of the surrounding rock gradually increases as tunnel excavation progresses, but within the construction cycle, the settlement deformation of the surrounding rock remains within a controllable range; (2) The maximum lateral deformation of temporary support increases initially with the advancement of construction steps, then decreases, and ultimately stabilizes by the sixth construction step; (3) The settlement deformation of the pipe shed exhibits a similar trend to the deformation of the surrounding rock, both gradually increasing as construction progresses. These findings suggest that the application of the new construction method in the context of mechanized construction not only improves construction efficiency but also ensures construction safety.