1 July 2013 in Engineering Structures
25 April 2013 in Smart Structures and Systems
1 June 2014 in Journal of Bridge Engineering
The long-term assessment of large and complex civil infrastructures, such as prestressed concrete bridges, based on Finite Element (FE) modelling remains a challenging task. The construction process, the influence of erection methods, the characterization of concrete properties, geometric accuracy and environmental conditions are key factors involved in the development of robust FE models. Data collected using permanently installed monitoring systems is the most reliable strategy to improve such assessments. Indeed, the availability of monitoring data is increasingly being used in the validation of design assumptions, updating of FE models and safety factors. In this work, the long-term behaviour of a long segmental bridge built in Portugal − Lezíria Bridge − is evaluated using FE model-updating. The combination of several factors, including: (i) the bridge’s scale, (ii) the monitoring database, (iii) the comprehensive scanning of important characteristics of the bridge and (iv) the FE modelling approach, makes this case study unique. Although the sensor trends are satisfactorily predicted, extrapolation of shrinkage and creep models, the influence of interior and exterior environments and thickness variations of the structural elements are identified as areas for further research
1 January 2012 in Journal of Bridge Engineering
Continuous bridge decks constructed with precast girders undergo significant stress changes caused by the concrete delayed deformations because of creep and shrinkage. These effects must be taken into account in the design of new structures. The validation of the analysis procedures should ideally be carried out through the comparison between the calculations and the results observed in real structures. However, experimental results of the construction and long-term behavior of these structures are scarce. The construction of a major bridge in Portugal has provided the opportunity to monitor one such structure. This paper presents the monitoring campaign and the analysis strategy that was developed to assess the long-term variation of strains and stresses in precast continuous bridges. The numerical analysis was validated by comparison with the results observed in the real bridge. The consequences of carrying out simplified analyses based on limited information about the concrete properties and the constr...
1 June 2011 in Structural Concrete
Currently, long‐term monitoring systems are mandatory for major civil engineering structures such as bridges, tunnels and dams. Generally, they monitor a set of physical, chemical and mechanical parameters in critical sections of the structure by incorporating appropriate sensors. The set of data collected demonstrates great potential in the prevention of damage and contributes to more efficient maintenance of the structures monitored. This work presents the long‐term monitoring system installed on the new Lezíria Bridge over the River Tagus in Portugal. The system was developed to control some aspects of the construction process and to survey the service life of the structure. A set of structural, durability and environmental parameters defining the bridge condition are remotely assessed in real‐time via a fibreoptic network. Aspects such as architecture, installation and functionality of the monitoring system are discussed and the innovative aspects of the implementation are highlighted. In this context, the main goal of this work is to present the long‐term monitoring system of Lezíria Bridge, sharing the experiences, the solutions and the procedures adopted, given their potential usefulness in the implementation of similar projects.
1 July 2018 in Measurement