Pankaj Chandra

Pankaj Chandra

Auto-generated profile, based on publicly available information

Pankaj Chandra

Indian Institute of Management , Vastrapur, Ahmedabad, 380 015, India

Research Focus & Metrics

Academic Career Length

35Years (1992-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 1994 in European Journal of Operational Research
Verified
Journal Article
Open access
PCPankaj Chandra
Pankaj Chandra
MFMarshall L. Fisher
Marshall L. Fisher

1 June 1993 in European Journal of Operational Research
Verified
Journal Article
Closed access
RBRohit Bhatnagar
Rohit Bhatnagar
PCPankaj Chandra
Pankaj Chandra
SGSuresh K. Goyal
Suresh K. Goyal

1 July 1992 in European Journal of Operational Research
Verified
Journal Article
Closed access
PCPankaj Chandra
Pankaj Chandra
MTMihkel M. Tombak
Mihkel M. Tombak

1 January 1998 in International Journal of Production Economics
Verified
Journal Article
Closed access
PCPankaj Chandra
Pankaj Chandra
WCWilliam W. Cooper
William W. Cooper
SLShanling Li
Shanling Li
ARAtiqur Rahman
Atiqur Rahman

24 July 2009 in International Journal of Production Research
Verified
Journal Article
Closed access
PCPankaj Chandra
Pankaj Chandra
PMPeeyush Mehta
Peeyush Mehta
DTDevanath Tirupati
Devanath Tirupati
We consider the permutation flow shop scheduling problem with earliness and tardiness penalties (E/T) and common due date for jobs. We show that the problem can be sub-divided into three cases: (i) the due date is such that all jobs are necessarily tardy; (ii) the due date is unrestricted; and (iii) the due date is between the two. Based on analytical results we provide partial characterisation of the optimal solution and develop a comprehensive approach for solving the problem over the entire range of due dates. Our approach, which draws upon the existing literature and results for the single machine problem, successfully exploits the properties of the optimal solution. Limited computational results indicate that the performance of the heuristic is reasonable and has the potential to significantly improve performance. This approach has been incorporated as part of the scheduling module of the production planning and scheduling system we developed for a medium-sized bulk drug manufacturer.

1 June 2007 in World Development
Verified
Journal Article
Closed access
RBRakesh Basant
Rakesh Basant
PCPankaj Chandra
Pankaj Chandra