Lianzhou Wu

Lianzhou Wu

Auto-generated profile, based on publicly available information

Lianzhou Wu

State Key Laboratory of Eco-hydraulics in Northwest Arid Region of China, Xi’an University of Technology, Xi’an 710048, China

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 January 2024 in Journal of Hydrology
Verified
Journal Article
Closed access
DJDanni Jia
Danni Jia
TZTe Zhang
Te Zhang
LWLianzhou Wu
Lianzhou Wu
XSXiaoling Su
Xiaoling Su
TBTao Bai
Tao Bai
QHQiang Huang
Qiang Huang

14 March 2015 in Water Resources Management
Verified
Journal Article
Closed access
PDF file
Tao BaiTao Bai
Tao Bai
LWLianzhou Wu
Lianzhou Wu
JCJian-Xia Chang
Jian-Xia Chang
QHQiang Huang
Qiang Huang

1 March 2020 in Journal of Cleaner Production
Verified
Journal Article
Closed access
LWLianzhou Wu
Lianzhou Wu
TBTao Bai
Tao Bai
QHQiang Huang
Qiang Huang

1 November 2020 in Journal of Hydrology
Verified
Journal Article
Closed access
YMYongsheng Ma
Yongsheng Ma
JCJianxia Chang
Jianxia Chang
AGAijun Guo
Aijun Guo
LWLianzhou Wu
Lianzhou Wu
Jie YangJie Yang
Jie Yang
LCLei Chen
Lei Chen


2 June 2019 in Water
Verified
Journal Article
Open access
PDF file
LWLianzhou Wu
Lianzhou Wu
Tao BaiTao Bai
Tao Bai
QHQiang Huang
Qiang Huang
JWJian Wei
Jian Wei
XLXia Liu
Xia Liu
It is important to investigate the laws of reservoir multi-objective optimization operations, because it can obtain the best benefits from inter-basin water transfer projects to mitigate water shortage in intake areas. Given the multifaceted demands of the Hanjiang to Wei River Water Diversion Project, China (referred hereafter as “the Project”), an easy-to-operate multi-objective optimal model based on simulation is built and applied to search the multi-objective optimization operation rules between power generation and energy consumption. The Project includes two reservoirs connected by a water transfer tunnel. One is Huangjinxia, located in the mainstream of Hanjiang with abundant inflow but no regulation ability, and the other is Sanhekou, located in the tributary of Hanjiang with multi-year regulation ability but less water. The layout of the Project increases the difficulty of reservoir joint optimization operations. Therefore, an improved Non-dominated Sorting Genetic Algorithm-II (I-NSGA-II) with a feasible search space is proposed to solve the model based on long-term series data. The results show that: (1) The validated simulation model is helpful to obtain Pareto front curves to reveal the rules between power generation and energy consumption. (2) Choosing a reasonable search step size to build a feasible search space based on simulation results for the I-NSGA-II can help find more optimized solutions. Considering the influence of the initial populations of the algorithm and limited computing ability of computers, the qualified rate of Pareto points solved by I-NSGA-II are superior to NSGA-II. (3) According to the characteristics of the Project, water transfer ratio threshold value of two reservoirs are quantified for maximize economic benefits. Moreover, the flood season is a critical operation period for the Project, in which both reservoirs should supply more water to intake areas to ensure the energy balanced of the entire system. The findings provide an easy-to-operate multi-objective operation model with the I-NSGA-II that can easily be applied in optimal management of inter-basin water transfer projects by relevant authorities.