Javad Mehri-Tekmeh

Javad Mehri-Tekmeh

Auto-generated profile, based on publicly available information

Javad Mehri-Tekmeh

Dept. Applied Mathematics, Faculty of Mathematics. University of Tabriz

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2015 in International Strategic Management Review
Verified
Journal Article
Open access
KZKazem Zare
Kazem Zare
JMJavad Mehri-Tekmeh
Javad Mehri-Tekmeh
SKSepideh Karimi
Sepideh Karimi
Supply chain refers to the integrated chain of organizations, loops, persons who are involving in stuff generation and costumer servicing. One of these services is the electricity which can be consumed as domestic, industrial, agriculture and etc. It can be considered that the electric power supply chain network has four stages which are electricity generation, transmission, distribution and consumption. In this paper, a framework of Strengths-Weaknesses-Opportunities-Threats (SWOT) is presented to analysis the electricity supply chain in north-west of Iran. In this regard, some interviews are done with several experts of electricity industry. In addition, an integrated AHP method which is combined with fuzzy-TOPSIS is proposed to prioritize the SWOT factors for the proposed electricity supply chain. The results show that the proposed method can be used effectively in order to determine a strategy plan with high prioritizing for planning and decision-making in electricity supply chain

18 July 2013 in Spanish Journal of Agricultural Research
Verified
Journal Article
Open access
PDF file
ABA. Bakhtiari
A. Bakhtiari
HNHossein Navid
Hossein Navid
JMJ. Mehri
J. Mehri
RBRemigio Berruto
Remigio Berruto
Dionysis BochtisDionysis Bochtis
Dionysis Bochtis
An approach based on ant colony optimization for the generation for optimal field coverage plans for the harvesting operations using the optimal track sequence principle B-patterns was presented. The case where the harvester unloads to a stationary facility located out of the field area, or in the field boundary, was examined. In this operation type there are capacity constraints to the load that a primary unit, or a harvester in this specific case, can carry and consequently, it is not able to complete the task of harvesting a field area and therefore it has to leave the field area, to unload, and return to continue the task one or more times. Results from comparing the optimal plans with conventional plans generated by operators show reductions in the in-field nonworking distance in the range of 19.3-42.1% while the savings in the total non-working distance were in the range of 18-43.8%. These savings provide a high potential for the implementation of the ant colony optimization approach for the case of harvesting operations that are not supported by transport carts for the out-of-the-field removal of the crops, a practice case that is normally followed in developing countries, due to lack of resources.

12 June 2012 in An International Journal of Optimization and Control: Theories & Applications (IJOCTA)
Verified
Journal Article
Open access
PDF file
SMShahram Morowati-Shalilvand
Shahram Morowati-Shalilvand
JMJavad Mehri-Tekmeh
Javad Mehri-Tekmeh
This paper deals with finding most vital links of a network which carries flows over time (also called ”dynamic flows”). Given a network and a time horizon T, Single Most Vital Link Over Time (SMVLOT) problem looks for a link whose removal results in greatest decrease in the value of maximum flow over time (dynamic maximum flow) up to time horizon T between two terminal nodes. SMVLOT problem is formulated as a mixed binary linear programming problem. This formulation is extended to a general case called k-Most Vital Links Over Time (KMVLOT) problem, in which we look for finding those k links whose removal makes greatest decrease in the value of maximum flow over time. A Benders decomposition algorithm is proposed for solving SMVLOT and KMVLOT problems. For the case of SMVLOT problem, the proposed algorithm is improved to a fully combinatorial algorithm by adopting an iterative method for solving existing integer programming problem. However, our experimental results showed the superiority of proposed methods.

1 August 2011
Verified
Conference Paper
Closed access
MAMohammad Hasan Aghdaie
Mohammad Hasan Aghdaie
SZSarfaraz Hashemkhani Zolfani
Sarfaraz Hashemkhani Zolfani
NRNahid Rezaeinia
Nahid Rezaeinia
JMJavad Mehri-Tekmeh
Javad Mehri-Tekmeh
Market segments evaluation and selection are crucial marketing activities of all companies. This paper proposes a fuzzy multiple criteria decision-making (MCDM) model for the evaluation and selection of market segments. A set of essential criteria for evaluating market segments and selection are identified based on the literature survey. Two MCDM methods are then used in the decision model. More precisely, Fuzzy Analytic Hierarchy Process (AHP) is used to calculate the weight of each criterion, and fuzzy technique for order preference by similarity to ideal solution (TOPSIS) approach is proposed to prioritize market segments from the best to the worst ones. The use of fuzzy set theory allows incorporating qualitative information and imprecise linguistic terms into the decision model. A case study on a dairycompany is put forward to illustrate the performance of the proposed methodology. The proposed model could help companies to evaluate and select market segments.

1 August 2011
Verified
Conference Paper
Closed access
JMJavad Mehri-Tekmeh
Javad Mehri-Tekmeh
AGAbdolhamid Safaei Ghadikolaei
Abdolhamid Safaei Ghadikolaei
NRNahid Rezaeinia
Nahid Rezaeinia
The greenhouse locating has become one of the most important problems for investors; it is a complicated problem and a decision under a variety of factors. This study aims at prioritize indicators and sub-indicators that effective in greenhouse locating. Analytic hierarchy process (AHP) is applied to formulate and prioritize the indicators and sub-indicators, most of the indicators are basically qualitative. Using fuzzy set theory we incorporate qualitative and partially known information into the decision model. A fuzzy approach is integrated with AHP method to make up the vagueness about the degree of importance of decision-makers on judgment.

9 September 2012 in An International Journal of Optimization and Control: Theories & Applications (IJOCTA)
Verified
Journal Article
Open access
PDF file
MBMina Saee Bostanabad
Mina Saee Bostanabad
JMJavad Mehri-Tekmeh
Javad Mehri-Tekmeh
ADAli Moghanni Dehkharghani
Ali Moghanni Dehkharghani
In this paper, multiproduct supply chain network is investigated with equity consideration,namely, obtaining the optimal flow pattern, in such a way that no user in the network can increasehis(her) benefit with change in product’s sending path. However, each kind of products, has anindividual cost function and, at the same time, contributes to its own and other product’s cost functionin an individual way. An algorithm is developed to find optimal flow pattern for such multiproductsupply chain network.