Nicholas Etherden

Nicholas Etherden

Auto-generated profile, based on publicly available information

Nicholas Etherden

Vattenfall R&D 169 92 Stockholm Sweden

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 March 2015 in IEEE Transactions on Industrial Informatics
Verified
Journal Article
Closed access
NENicholas Etherden
Nicholas Etherden
VVValeriy Vyatkin
Valeriy Vyatkin
MBMath H. J. Bollen
Math H. J. Bollen
This paper assesses the communication, information, and functional requirements of virtual power plants (VPPs). A conceptual formulation of the interoperability requirements, as well as a comparative study of their fulfillment by state-of-the-art communication techniques, is presented. VPP requirements are then mapped against services and information models of IEC 61850 and common information model (CIM) power utility automation standards. Proposals are given for extensions of the IEC 61850 standard to enhance the interaction between the VPP controller and the distributed energy resources. Finally, the methodology and concepts are applied to a specific VPP consisting of hydro and wind plants, solar photovoltaic (PV) power, and storage facilities. Several applications to provide grid services from the proposed VPP in an existing 50-kV grid are covered. The implementation of the VPP communication and control architecture in the supervisory control and data acquisition (SCADA) of demonstration plant is also presented.


5 October 2024 in Electric Power Systems Research
Verified
Journal Article
Open access
TOTaís Tavares de Oliveira
Taís Tavares de Oliveira
MBMath Bollen
Math Bollen
NENicholas Etherden
Nicholas Etherden


17 September 2021 in Electricity
Verified
Journal Article
Open access
PDF file
EMEnock Mulenga
Enock Mulenga
MBMath Bollen
Math Bollen
NENicholas Etherden
Nicholas Etherden
This paper presents a stochastic approach to single-phase and three-phase EV charge hosting capacity for distribution networks. The method includes the two types of uncertainties, aleatory and epistemic, and is developed from an equivalent method that was applied to solar PV hosting capacity estimation. The method is applied to two existing low-voltage networks in Northern Sweden, with six and 83 customers. The lowest background voltage and highest consumption per customer are obtained from measurements. It is shown that both have a big impact on the hosting capacity. The hosting capacity also depends strongly on the charging size, within the range of charging size expected in the near future. The large range in hosting capacity found from this study—between 0% and 100% of customers can simultaneously charge their EV car—means that such hosting capacity studies are needed for each individual distribution network. The highest hosting capacity for the illustrative distribution networks was obtained for the 3.7 kW single-phase and 11 kW three-phase EV charging power.

16 September 2023 in Sustainable Energy, Grids and Networks
Verified
Journal Article
Open access
EMEnock Mulenga
Enock Mulenga
NENicholas Etherden
Nicholas Etherden