A new approach of integrated design and delivery solutions (IDDS) aims to radically improve the performance of the construction industries. IDDS builds upon recent trends in the construction industries that have seen the widespread adoption of technologies such as building information modelling (BIM) and innovative processes such as integrated project delivery. However, these innovations are seen to develop in isolation, with little consideration of the overarching interactions between people, process and technology. The IDDS approach is holistic in that it recognizes that it is only through a combination of initiatives such as skill development, process re-engineering, responsive information technology, enhanced interoperability and integrating knowledge management, among others, that radical change can be achieved. To implement IDDS requires step changes in many project aspects, and this gap between current performance and that required for IDDS is highlighted. The research required to bridge t...
This paper presents a method to detect and recognize mature tomato fruit clusters on a complex-structured tomato plant containing clutter and occlusion in a tomato greenhouse for automatic harvesting purpose. A color stereo vision camera (PGR BumbleBee2) is applied as the vision sensor. The proposed method performs a 3D reconstruction with the data collected by the stereo camera to create a 3D environment for further processing. The color layer growing (CLG) method is introduced to segment the mature fruits from the leaves, stalks, background and noise. Target fruit clusters can then be located by depth segmentation. The experimental data was collected from a tomato greenhouse and the method is justified by the experimental results. Our experiments included severe self and stereo occlusion, which wasn't both included in the previous work.
28 May 2004 in Journal of Computing and Information Science in Engineering
The efficiency of layered manufacturing processes, the dominant form of rapid prototyping (RP), can be dramatically improved by building multiple, arbitrarily shaped, three-dimensional (3D) parts simultaneously in the available working volume. Given a large set of parts waiting to be manufactured, the goal is to arrange a subset of the parts to effectively use the available working volume. Generating good solutions for this problem is difficult, since the number of possible subsets grows exponentially, and since it is very computationally expensive to evaluate potential packing arrangements. This paper documents a comprehensive solution to this problem, based on a hybrid heuristic-optimization algorithm and an object simplification technique to reduce computation times. The optimization algorithm combines a heuristic to select the ordering of the parts being packed, and a simulated annealing algorithm to optimize the position of each part. The successful placement of individual parts relies on a unique metric that was developed to compare different packing arrangements of the same parts. Test cases based on real-world problems demonstrate the effectiveness of the overall approach.