Construction issues of high-speed rail infrastructures have been increasingly concerned worldwide, of which the subgrade settlement in soft soil area becomes a particularly critical problem. Due to the high compressibility and low permeability of soft soil, the post-construction settlement of the subgrade is extremely difficult to control in these regions, which seriously threatens the operation safety of high-speed trains. In this work, the significant issues of high-speed railway subgrades in soft soil regions are discussed. The theoretical and experimental studies on foundation treatment methods for ballasted and ballastless tracks are reviewed. The settlement evolution and the settlement control effect of different treatment methods are highlighted. Control technologies of subgrade differential settlement are subsequently briefly presented. Settlement calculation algorithms of foundations reinforced by different treatment methods are discussed in detail. The defects of existing prediction methods and the challenges faced in their practical applications are analyzed. Furthermore, the guidance on future improvement in control theories and technologies of subgrade settlement for high-speed railway lines and the corresponding challenges are provided.
1 September 2020 in Journal of Geotechnical and Geoenvironmental Engineering
Track degradation and defects of existing passenger and freight mixed railroads are concentrated in bridge–embankment transition zones. Heavy axle load (HAL) operation on existing railroads presents a complexity in evaluating the evolution of the differential settlement of the overloaded ballasted track, especially in bridge–embankment transition zones. In this paper, an iterative prediction methodology of track differential settlement in transition zones is developed. In this methodology, the history of the loading on the ballast and the history of the loading on the subgrade are considered as well as the vehicle–track interactions. The sleeper–ballast contact forces and the subgrade soil deviator stress field change with iterations. A case study was analyzed to investigate the track differential settlement in a bridge–embankment transition zone of an overloaded passenger and freight mixed line. The distribution of the sleeper–ballast contact forces along the track and the distribution of the subgrade soil deviator stress were calculated with a vehicle–track–subgrade model. Results indicate that the critical axle load of the vehicle for existing ballasted track transition zones without any reinforcement treatment is 27 t. Because HAL vehicles may have axle loads up to 39 t, the increase of the train axle load, reinforcement treatments, and remediations are required for existing transition zones. The maintenance scheduling for tracks under different axle loads was calculated.
1 September 2020 in Computers and Geotechnics
1 May 2022 in Applied Mathematical Modelling
9 February 2022 in International Journal for Numerical and Analytical Methods in Geomechanics
13 February 2023 in Construction and Building Materials