Xianwei Ma

Xianwei Ma

Auto-generated profile, based on publicly available information

Xianwei Ma

School of Material and Chemical Engineering

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2019 in Construction and Building Materials
Verified
Journal Article
Closed access
XMXianwei Ma
Xianwei Ma
JLJianhui Liu
Jianhui Liu
CSCaijun Shi
Caijun Shi

1 April 2019 in Construction and Building Materials
Verified
Journal Article
Closed access
JLJianhui Liu
Jianhui Liu
CSCaijun Shi
Caijun Shi
NFNima Farzadnia
Nima Farzadnia
XMXianwei Ma
Xianwei Ma

1 March 2019 in Cement and Concrete Composites
Verified
Journal Article
Closed access
JLJianhui Liu
Jianhui Liu
NFNima Farzadnia
Nima Farzadnia
CSCaijun Shi
Caijun Shi
XMXianwei Ma
Xianwei Ma

1 January 2019 in Construction and Building Materials
Verified
Journal Article
Closed access
XMXianwei Ma
Xianwei Ma
QYQiang Yuan
Qiang Yuan
JLJianhui Liu
Jianhui Liu
CSCaijun Shi
Caijun Shi

1 August 2019 in Construction and Building Materials
Verified
Journal Article
Closed access
JLJianhui Liu
Jianhui Liu
NFNima Farzadnia
Nima Farzadnia
CSCaijun Shi
Caijun Shi
XMXianwei Ma
Xianwei Ma

23 May 2013 in Advances in Materials Science and Engineering
Verified
Journal Article
Open access
PDF file
XMXianwei Ma
Xianwei Ma
ZWZhenyu Wang
Zhenyu Wang
The paste/mortar attached to the recycled aggregate decreases the quality of the aggregate and needs to be stripped. The stripped paste/mortar is roughly 20% to 50% in waste concrete, but relevant research is very limited. In this paper, the effects of ground waste concrete (GWC) powder, coming from the attached paste/mortar, on water demand for normal consistency, setting time, fluidity, and compressive strength of cement were analyzed. The results show that the 20% of GWC powder (by the mass of binder) has little effect on the above properties and can prepare C20 concrete; when the sand made by waste red clay brick (WRB) replaces 20% of river sand, the strength of the concrete is increased by 17% compared with that without WRB sand.