Xinlei Hu

Xinlei Hu

Auto-generated profile, based on publicly available information

Xinlei Hu

School of Traffic and Transportation Engineering, Central South University, Changsha, Hunan, China

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2020 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
XHXinlei Hu
Xinlei Hu
FSFeng Shi
Feng Shi
GXGuangming Xu
Guangming Xu
JQJin Qin
Jin Qin

28 January 2024 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
XHXinlei Hu
Xinlei Hu
JHJie Huang
Jie Huang
XLXuanji Long
Xuanji Long
JWJiao'e Wang
Jiao'e Wang

24 December 2021 in Journal of Advanced Transportation
Verified
Journal Article
Open access
PDF file
LDLianbo Deng
Lianbo Deng
JXJing Xu
Jing Xu
NZNingxin Zeng
Ningxin Zeng
XHXinlei Hu
Xinlei Hu
This paper studies the multistage pricing and seat allocation problems for multiple train services in a high-speed railway (HSR) with multiple origins and destinations (ODs). Taking the maximum total revenue of all trains as the objective function, a joint optimization model of multistage pricing and seat allocation is established. The actual operation constraints, including train seat capacity constraints, price time constraints in each period, and price space constraints among products, are fully considered. We reformulate the optimization model as a bilevel multifollower programming model in which the upper-level model solves the seat allocation problem for all trains serving multiple ODs in the whole booking horizon and the lower optimizes the pricing decisions for each train serving each OD in different decision periods. The upper and lower are a large-scale static seat allocation programming and many small-scale multistage dynamic pricing programming which can be solved independently, respectively. The solving difficulty can be significantly reduced by decomposing. Then, we design an effective solution method based on divide-and-conquer strategy. A real instance of the China’s Wuhan-Guangzhou high-speed railway is employed to validate the advantages of the proposed model and the solution method.

1 January 2019 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
HSHuanyin Su
Huanyin Su
WTWencong Tao
Wencong Tao
XHXinlei Hu
Xinlei Hu
In high‐speed rail networks, trains are operated with high speeds and high frequencies, which can satisfy passenger demand with different expected departure times. Given time‐dependent demand, this paper proposes a line planning approach with capacity constraints for high‐speed rail networks. In this paper, a bilevel optimization model is formulated and the constraints include track section capacity per unit time, train seat capacity, and the gap between the number of starting trains and that of ending trains at a station. In the upper level, the objective is to minimize train operational cost and passenger travel cost, and the decision variables include the line of each train, carriage composition of each train, train stop patterns, train start times, and train arrival and departure times at stops in the line plan. In the lower level, a schedule‐based passenger assignment method, which assigns time‐varying demand on trains with seat capacity constraints by simulating the ticket‐booking process, is used to evaluate the line plan obtained in the upper level. A simulated annealing algorithm is developed to solve the model in which some strategies are designed to search for neighborhood solutions, including reducing train carriages, deleting trains, adding trains, increasing train carriages, and adjusting train start times. Finally, an application to the Chinese high‐speed rail network is presented. The numerical results show that (i) the average time deviations between the expected departure times and the actual boarding times of passengers are within 30 min, (ii) the unserved passengers are less than 200, and (iii) the average load factors of trains are about 70%. Hence, line plan solutions meet time‐dependent demand well and satisfy the capacity constraints for high‐speed rail networks.

2 October 2023 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
WZWenliang Zhou
Wenliang Zhou
YHYu Huang
Yu Huang
XHXinlei Hu
Xinlei Hu
LDLianbo Deng
Lianbo Deng
GXGuangming Xu
Guangming Xu

25 September 2017 in PLOS ONE
Verified
Journal Article
Open access
PDF file
XHXinlei Hu
Xinlei Hu
SZShuo Zhao
Shuo Zhao
FSFeng Shi
Feng Shi
JHJie Huang
Jie Huang
XSXinghua Shan
Xinghua Shan
Circuity, defined as the ratio of the shortest network distance to the Euclidean distance between one origin–destination (O-D) pair, can be adopted as a helpful evaluation method of indirect degrees of train paths. In this paper, the maximum circuity of the paths of operated trains is set to be the threshold value of the circuity of high-speed train paths. For the shortest paths of any node pairs, if their circuity is not higher than the threshold value, the paths can be regarded as the reasonable paths. With the consideration of a certain relative or absolute error, we cluster the reasonable paths on the basis of their inclusion relationship and the center path of each class represents a passenger transit corridor. We take the high-speed rail (HSR) network in China at the end of 2014 as an example, and obtain 51 passenger transit corridors, which are alternative sets of train paths. Furthermore, we analyze the circuity distribution of paths of all node pairs in the network. We find that the high circuity of train paths can be decreased with the construction of a high-speed railway line, which indicates that the structure of the HSR network in China tends to be more complete and the HSR network can make the Chinese railway network more efficient.